Celebrating Completion of new KMS Without Flooding
As I passed the beautiful new Kingwood Middle School (KMS) last weekend, it struck me. Despite many heavy rains during construction that lasted almost three years, neighbors never reported flooding.
Too often, I hear of construction projects that alter drainage and flood neighbors. But Humble ISD seemed to consider that problem from the start and took appropriate measures to prevent it. The District even built a temporary stormwater detention basin before tearing down the old KMS. It protected the neighborhood during demolition and construction before the new permanent basin was completed.
The result is a magnificent architectural gem – a showcase for the entire community – without drama, stress or destruction.
Pictures Taken 8/27/23
The current drought has the football-field grass struggling. But somehow, the grass on the sides of the detention basin seems well established. The vegetation on the slopes reduces erosion which could clog the inflow/outflow pipes.
For Photographic History of Project
For photos showing the history of Kingwood Middle School demolition and re-construction, see below.
- July 20, 2023
- June 9, 2023
- November 29, 2022
- November 18, 2022
- November 12, 2022
- November 9, 2022
- June 2022
- May 2022
- March 2022
- February 2022
- December 2021
- November 2021
- March 2021
- November 2020
Thanks to the Humble ISD, its board and contractors for a job well done.
Posted by Bob Rehak on 9/1/23