Six TCEQ Investigations Lead to 13 Citations for Woodridge Village Developer and Contractors

Since flooding in Elm Grove and North Kingwood Forest last year, the TCEQ has completed half a dozen investigations of Woodridge Village with more in the works. Woodridge Village is the troubled Perry Homes development where contractors clearcut 268 acres while installing less than 25% of the required detention capacity.

The TCEQ has repeatedly charged Perry contractors and subsidiaries with stormwater pollution violations and unauthorized discharge of sediment. Below are results of six investigations that led to a total of 13 citations. Together the 449 pages of these investigations indicate a lax attitude toward regulations, repeated failures to comply, poor coordination among vendors, and lack of awareness of responsibilities.

Investigation 1571093 of Figure Four Partners in June 2019

On June 17 and 18, 2019, TCEQ investigators cited Figure Four Partners, LTD for “failure to prevent the unauthorized discharge of sediment-laden water from the construction site which could contribute to pollution in waters of the state of Texas.” (See Investigation 1571093 and attachments.)

Investigators found Figure Four failed to implement and maintain best management practices. They tracked the illegal discharge 2.5 miles down Taylor Gully. Where the stream entered woods, lack of access prevented tracking the discharge further.

TCEQ ordered the operator to install adequate sediment controls to minimize discharges from the site.

Investigation 1579654 of Rebel Contractors in June 2019

This was an investigation of Rebel Contractors, which had responsibility for the southern 80 acres of the site.

The TCEQ report starts by noting that two previous complaints about Rebel Contractors had been referred to Montgomery County for investigation.

In this investigation, TCEQ collected water samples upstream and adjacent to the development that were not impacted. They also collected samples above the outfall from the development and downstream of it that were.

They found that total suspended solids (TSS) in the non-impacted samples ranged from 29 to 45 milligrams/liter. The impacted samples, however, ranged from 245 to 620 milligrams per liter.

Investigators also looked at total dissolved solids (TDS). Non-impacted samples ranged from 128 to 158 milligrams per liter. Impacted samples ranged from 2053 to 2804 milligrams per liter.

Water from and below the site had significantly higher TSS and TDS.

Investigators allege Rebel failed to implement and maintain effective Best Management Practices. They cited Rebel for “failure to prevent the unauthorized discharge of sediment-laden water from the construction site which could contribute to pollution in waters of the state of Texas.” They also cited Rebel for failure to prepare a Stormwater Pollution Prevention Plan. It took Rebel six weeks to prepare and submit the plan to the TCEQ.

(See Investigation 1579654 and attachments.)

Investigation 1604733 of Figure Four Partners in October 2019

On October 25, 2019, investigators returned to the site and found Figure Four had violations similar to June. They ordered Figure Four, once again, to install adequate sediment controls that minimized discharges from the site. (See Investigation 1604733 and attachments.) They ordered Figure Four to install adequate controls that reduced discharges.

Investigation 1579655 of Double Oak Construction in June 2019

Double Oak Construction is responsible for clearing and grubbing on the Woodridge site. In June, TCEQ conducted an investigation during which they collected the previously mentioned water samples. They cited Double Oak for failure to prevent unauthorized discharges of sediment-laden water and failure to prepare a Stormwater Pollution Prevention Plan.

(See Investigation 1579655 and attachments.)

They also found that Double Oak could not identify where discharges went. They thought it was Galveston Bay.

By the end of August last year, Double Oak still had not submitted a Stormwater Pollution Prevention Plan.

Investigation 1604738 of Rebel Contractors in October 2019

Second verse same as the first. Investigators found elevated levels of suspended and dissolves solids from the site relative to non-impacted areas. TCEQ alleges Rebel failed to implement and maintain Best Management Practices. They also allege discharge of pollutants, i.e., sediment-laden stormwater and failure to post a construction permit.

TCEQ ordered Rebel to control discharges and post a permit. It took Rebel 7 weeks to post the permit.

(See Investigation 1604738 and attachments.)

Investigation 1604741 of D&J Construction in October 2019

TCEQ cited D&J for failure to prepare a Stormwater Pollution Prevention Plan and failure to include required information on their construction site notice.

(See Investigation 1604741 and attachments.)

Posted by Bob Rehak on 2/1/2020

886 Days since Hurricane Harvey and 135 since Imelda

The thoughts expressed in this post represent opinions on matters of public concern and safety. They are protected by the First Amendment of the US Constitution and the Anti-SLAPP Statute of the Great State of Texas.

Perry Homes Converting Woodridge Village to Scuba Center or Maybe a…

Woodridge Village after a one-inch rain.

From Lifestyles of the Rich and Infamous

Kathy Perry Britton, CEO of Perry Homes, a titan of business and devotee of Zig “See You at the Top” Ziglar, has reportedly given up on her dream of building swamp homes in Woodridge Village. She has new ideas to turn mud into money.

Her confidante and hairdresser hints Britton has toyed with several options. The leading one at the moment: Turning the land into a world-class scuba center called “That Sinking Feeling.” She plans to market it to people who are underwater on their homes.

If You Can’t Beat ‘Em, Boil ‘Em

“Perry Homes stands for quality,” she supposedly said. “And always will. If the scuba center doesn’t work, there’s no shortage of mud bugs out there. We’ll turn this into the Crawfish Capital of the Gulf Coast.” And then in a comment that reportedly angered crustacean-rights activists, she added, “If you can’t beat ’em, boil ’em!”

The irrepressible, unstoppable Britton reportedly has other backup options, too. “If that doesn’t work, Vince McMahon has approached us about turning this into the WWE Female Mud Wrestling Capital of the World,” Britton’s chambermaid reported. “He has plenty of stars lined up to turn this into a fairy-tale success. Vince has already received letters of intent from Misty Raine, Muddie Waters, and Hurrie Spitball Caine.”

Ms. Britton, paraphrasing Mark Twain, reportedly told her bootlicker, “The rumors of our bankruptcy have been greatly exaggerated. We have plenty of options to make a buck out there if suing the flood victims doesn’t work.”

According to unnamed insiders, Christian Louboutin has also supposedly brainstormed with Britton about brand extensions. Britton is confident there’s a market for stiletto hip-waders in Houston. “It’s a natural in places like Elm Grove. How else would women get to their cars in the rain?”

MoCo Offers Tax Incentives

The rumor mill also says that Wham-O has approached Perry Homes about turning Woodridge Village into the world’s largest Slip ‘N Slide. The irrepressible Britton told her fingernail artist, “Montgomery County even offered us tax breaks, finder’s fees, and margaritas. They’re so accommodating up there.”

In a rare moment of candor, Britton reportedly complained to her lawyer extraordinaire, J. Carey “Promise Them Anything” Gray. “I’m tired of all the mud slinging by these so-called flood victims in Elm Grove. It’s their fault they flooded. They built downstream from us. Duh! What were they thinking?”

“If worse comes to bratwurst,” Britton supposedly bragged to her chauffeur, “Home Depot and Lowes have both expressed interest in building mega repair centers on the property. They have raved to us about the possibilities. Repeat flooding. Hundreds of homes each time. Think about the potential synergies. My God, we could go public on the rumors alone and make a killing.”

The Right to Make a Profit

“I don’t know what these Elm Grove people are complaining about,” Britton reportedly grumbled to her masseuse. “I have to fly to Paris for a good mud bath. They get it for free.”

“These Elm Grove people are so hurtful. Always slinging mud. I have feelings, too. I just wish they could be positive for a change and see the marketing potential in all of this. We have a right to make a profit. This IS Texas after all.”

With that, Britton reportedly hurried off to discuss a separate deal with Monster MudTruck Rodeo organizers.

In Loving Memory of Robin Leach, A Parody Roast Post by Bob Rehak on 1/28/2020

882 Days since Hurricane Harvey and 131 since Imelda

This is a work of fiction. Any resemblance between characters in this post and executives of Perry Homes is strictly coincidental.

The thoughts expressed in this post represent opinions on matters of public concern and safety. They are protected by the First Amendment of the US Constitution and the Anti-SLAPP Statute of the Great State of Texas.

Perry Homes Still Not Finished with Detention Pond After 90 Days

On October 17th, a lawyer for Perry Homes’ subsidiaries and contractors promised the City of Houston that it would complete the Woodridge Village S2 detention pond in 30-45 days. Ninety days later, they still had not finished.

Perry Homes Far from Complete

Despite the fact that Perry had substantially completed S2 before Imelda, it has now taken the company 2X-3X more time than they said it would – with no end in sight.

I took all the ground-level photos below on January 25, 2020.

Looking north toward the southern edge of S2. Perry is elevating the lip of the pond which is now as high as this truck.
Looking NW. The elevated lip tapers down as you move west of Village Springs. This should effectively shift the locus of the next flood.
View looking west at construction work on southern lip of pond. Backslope swales were destroyed. Grass is gone.
Because of lack of grass, increased slope, and lack of compaction, knee-high mud is piling up against silt fence.
Edythe Cogdill, owner of the home in the background, is near tears over the lack of progress in Woodridge Village, out of frame to the right.
Every home on Cogdill’s block flooded twice. This was the scene today. Six of eight homes on the block have been sold or are up for sale.
S2 Pond still under construction. Photo taken 1.20.2020.

Perry Drives Families from Their Homes

I visited three Elm Grove families today. All have “snapped.” They have that 1000-yard stare.

  • One man kept shouting over and over again, “What are we to do?”
  • One woman broke down crying.
  • Another family is getting ready to walk away from their home.

They are not alone.

  • On one block I saw 25 homes for sale.
  • At the end of Village Springs, six of eight owners had put their homes up for sale.
  • On Shady Gardens Drive, a resident told me 22 neighbors had moved out.

This neighborhood has already been destroyed by Perry Homes’ broken promises. Fear paralyzes the few families remaining. Fear every time it rains. Fear for their safety. Fear of financial ruin. Fear of renovating their homes only to be flooded a third time.

Perry Homes’ Actions Mock City of Houston Leaders

Perry Homes’s inexplicable and inexcusable delays mock the City of Houston, the Mayor, the Mayor Pro Tem and City Attorney. Their actions say with impunity, “We have nothing to fear from you. We are more powerful.”

The BBB has found that Perry Homes treats its customers with the same disdain.

Perhaps the City should start slow-walking Perry Homes’ permit applications until they live up to their promises.

Posted by Bob Rehak on 1/25/2020

879 Days after Hurricane Harvey and 128 since Imelda

The thoughts expressed in this post represent opinions on matters of public concern and safety. They are protected by the First Amendment of the US Constitution and the Anti-SLAPP Statute of the Great State of Texas.

Woodridge Village Swamped by 1/4 Inch of Rain in 7 Days

.28 inches of rain in the last week swamped Woodridge Village. Woodridge contributed to the flooding of Elm Grove and North Kingwood Forest twice last year after contractors clearcut 268 acres.

Gage at West Lake Houston Parkway

Standing Water Over Half of Development

Looking southwest across Woodridge Village. Virtually half of subdivision is holding ponding water. This and all photos below taken on 1/20/2020.
A closer shot. Looking southwest across Woodridge Village at land once classified as wetlands by USGS

Extremely Low Infiltration Rate

Now we know why the runoff rate was so high after Perry Homes clearcut the land. The soils may be sandy clays with very low infiltration rates. Alternatively, there may be clay close to the surface that prevents water from infiltrating. 

If approximately 1/4 inch of rain in seven days does this, you can imagine how much would run off when you get 6 to 12 inches in a day.

LJA designed this development to hold 12 inches of rain that falls in 24 hours. But contractors still have only installed 23% of the detention. And the runoff rate may have been based on non-representative samples.

Mysteries Abound

Also Perry Homes’ clearcut the entire northern section when LJA promised that contractors would only cut 30 acres in Phase One. That could be a Career Limiting Move (CLM) for Perry Homes CEO Kathy Perry Britton.

Mysteriously, the core sampling done as part of the geotechnical report managed to miss all areas classified as wetlands in the USGS National Wetlands Inventory.

Mysteriously, Perry Homes hired a private consultant to review the wetlands rather than seeking a jurisdictional delineation from the US Army Corps of Engineers. Perry claims the consultant found no wetland issues though Perry has not released the consultant’s report.

Those wetland areas largely coincided with the areas now holding the ponding water.

USGS Wetlands Map. Background shows Woodridge Village BEFORE clearcutting.

So many questions and so little time.

Movement in Court Case and on Ground

The Harris County District Clerk’s office shows absolutely no movement in the court case between Perry subsidiaries, their contractors and flood victims. The last motion on file: December 27.

Meanwhile, Perry is still working on the S2 detention pond that they virtually completed last August. On October 17, lawyer extraordinaire and local savant J. Carey Gray promised they would finish that pond in 45 days. So far, it’s been 95. And they continue to UNDO work previously completed.

January 20, 2020. Contractors continue to elevate the southern and eastern edges of Woodridge Village’s S2 detention pond.
The same berm from ground level. Elevated several feet above Elm Grove. Backslope interceptor swale mysteriously eliminated. Ground now sloped to funnel runoff from slope directly into Elm Grove (left). Photo courtesy of Jeff Miller.
Where this pipe sticks up, there used to be a swale designed to keep water from flowing into Elm Grove and funnel it into the pond. See swale in background next to fence that contractors have not yet filled in. Photo courtesy of Jeff Miller.

This whole sad, sorry development reminds me of one of those Hollywood horror flicks in which the teenagers do everything wrong, oblivious to the danger that lurks beneath them. I expect to see Dracula’s hand poking up out of the clay any second.

Posted by Bob Rehak on 1/20/2020 with photos from Jeff Miller

874 Days since Hurricane Harvey and 123 since Imelda

The thoughts expressed in this post represent opinions on matters of public concern and safety. They are protected by the First Amendment of the US Constitution and the Anti-SLAPP Statute of the Great State of Texas.

Perry Homes’ Contractors Return to Woodridge Village, But Undo Some Previous Work, Add to Sediment-Laden Runoff

After pulling all construction equipment from the Woodridge Village site in December, Perry Homes’ contractors returned this week. They are still working on the S2 (second southern) detention pond. But the new work appears to undo some previous work, and make sediment-laden runoff worse.

Woodridge Still Far Short of Promised Detention Capacity

After about 15 months of working on the Woodridge Village site, Perry Homes still has only 23% of the detention capacity installed. And even that does not yet meet Montgomery County regulations (see below). None of the work this week focused on new detention ponds that would reduce flood risk for Elm Grove residents.

Perry Homes had promised to build three ponds on the northern section. But they have not started any of those yet.

And Far Behind Schedule

On October 17th last year, an attorney for Perry Homes, J. Carey Gray, promised the Houston City attorney that Perry would have S2 completed in no more than 45 days. It has now been 86 days since Mr. Gray sent his letter and the work is still far from complete. I’m sure this creates an embarrassment to the Mayor of Houston, especially considering that Perry Homes gave $5000 to his re-election campaign. It creates the appearance of trying to buy favors.

Still Does Not Comply With MoCo Regulations

I previously detailed seven Montgomery County regulations that Perry Homes’ detention ponds did not meet. Perry Homes did not:

  • Put 30-foot wide maintenance roads around the ponds.
  • Place backslope interceptor swales around the ponds.
  • Have effective erosion control measures in place.
  • Implement protective measures for their overflow spillway.
  • Prevent increases in downstream flood levels.
  • Prepare a geotechnical report (that they shared with Montgomery County) showing groundwater levels at detention pond sites.
  • Ensure complete drainage of the detention pond.

Detention Pond Falls Short of Promised Capacity

Calculations for the capacity of the detention ponds begin from the bottom of the pond – when empty. When partially filled with water, the calculation begins from the top of the water. The bottom 2-3 feet of S2 has retained water for months, indicating that part of the pond is below the water table. So you can subtract about 20% of capacity that LJA Engineering promised and that Rebel Contractors initially built.

Adding Maintenance Road, Subtracting Backslope Swales

The flurry of work this week centered around creating the maintenance road that regulations demand. Or perhaps Perry is just building up the lip of S2 to compensate for the water it holds. Both are potentially good things.

However, workers also started filling the backslope interceptor swales they previously built. This created a sharp slope next to neighboring residents’ property and increased runoff toward the residents during last night’s rain.

Contractors placing dirt along the southern edge of the S1 pond to build a road earlier in the week.
Elm Grove Trail on left. Woodridge Village on right of silt fence. Note how land is being sloped toward Elm Grove.

An interceptor swale collects water above slopes and diverts it to the bottom of a detention pond through pipes so runoff does not create erosion on the slopes that lead to the pond.

Perry Homes has given no reason why they started filling in the swale they previously built that complied with MoCo regulations.

Looking west from Village Springs Drive. In the foreground, you can see how workers built a road and filled in the interceptor swale between it and Elm Grove on the left.
Still looking west. From this drain pipe, you can better see the grassy swale previously created to drain water into the detention pond (right) and to keep it out of Elm Grove (left).
Reverse shot, looking east. Here you can see how workers filled in the swale and created a road three to four feet high. Residents worry about the effect.
Looking east near the entrance to Taylor Gully from the road, the change in drainage toward Elm Grove (right) becomes very apparent. Picture taken Friday afternoon before rain. Road was uncompacted except for the weight of the small bulldozer spreading dirt (see first picture above).

Same Changes Between S1 and Sherwood Trails

The same changes appear along the southern edge of S1, north of Sherwood Trails, though the road does not appear as high and there also appears to be a shallow swale.

Looking west along the southern edge of Woodridge Village S1 detention pond, toward Woodland Hills from Fair Grove.

No Effective Erosion Control Yet

Perry Homes has also failed to put effective erosion control measures in place in Woodridge Village. For instance, most pond banks do not yet have grass planted on them.

The new road covered up what little grass had grown around the ponds. And raw dirt now fills the former interceptor swale.

A one-inch rain last night swept sediment into the pond, which emptied into Taylor Gully and Caney Creek before joining the East Fork of the San Jacinto.

Massive Pollution

Boater Josh Alberson took the dramatic picture below this afternoon where Caney Creek joins the East Fork. The East Fork water looks natural, but the water coming from Caney Creek via Taylor Gully is clouded with sediment. Woodridge Village is the only large source of exposed earth up Taylor Gully at this time. (Alberson verified that this sediment-laden runoff was NOT coming from the Triple PG mine up White Oak Creek.)

Water from Taylor Gully (right) merging with East Fork water (left) on Saturday afternoon, 1/11/2020, after a 1-inch rain last night.

Posted by Bob Rehak with images from Josh Alberson, Edythe Cogdill and Nancy Vera

865 Days since Hurricane Harvey and 114 since Imelda

The thoughts expressed in this post represent opinions on matters of public concern and safety. They are protected by the First Amendment of the US Constitution and the Anti-SLAPP Statute of the Great State of Texas.

Double Oak Construction Causes Yet Another Delay in Elm Grove Lawsuits

After stonewalling discovery in the Elm Grove lawsuits, on December 27th, defendant Double Oak Construction objected to use of the documents in court that the judge forced it to produce. I don’t know what’s in those documents, but I plan to camp out at the courthouse when this case goes to trial. The documents must be juicier than Juicyfruit gum.

Double Oak appears to be a Perry Homes’ contractor working primarily on the northern portion of the Woodridge Village site, where downed trees are now being turned into mulch.

Summary of Objections

After producing documents, Double Oak now objects to their use in court.

The plaintiffs filed notice that they intended to use, in court, all documents and items produced by Double Oak during discovery.

Double Oak claims that this notice is insufficient and contradicts the Texas Rules of Civil Procedure.

The Plaintiff’s Notice leaves them, they say, without knowledge of the specific documents plaintiffs intend to use. That, claims Double Oak, handicaps the company in its ability to defend itself. It must prepare to object to every single document, they say.

But the objections don’t stop there. Double Oak reserves its right to make further objections when the company becomes aware of specific documents being used by the plaintiffs.

And if that isn’t enough, Double Oak reserves the right to object to all documents on all grounds, including documents produced by third parties.

Here is the full text of Double Oak’s objections.

No End in Sight to Delays

Sadly, there’s no end in sight to these procedural delays in court. They parallel the construction delays on the actual job site.

Perry Homes broke its promise to the Houston City Attorney to accelerate construction of additional detention ponds. Perry pulled all actual excavation equipment from the job site in December. Only Double Oak crews turning dead trees into mulch remain.

Meanwhile, the flood risk remains high for the people of Elm Grove. Based on detention capacity in place today, that risk is no lower now than it was in August before Imelda. That’s when work on the site came to a virtual standstill.

Playing the delay game is a high risk strategy for companies already facing obscenely high risk due to previous delays.

Posted by Bob Rehak on 1/5/2020

859 Days after Hurricane Harvey and 108 after Imelda

The thoughts expressed in this post represent opinions on matters of public concern and safety. They are protected by the First Amendment of the US Constitution and the Anti-SLAPP Statute of the Great State of Texas.

Perry Homes’ Departure Leaves Future of Sherwood-Elm Grove Trail in Doubt

Perry Homes left the future of a popular Kingwood trail in doubt when it abruptly removed its excavation equipment from Woodridge Village before Christmas. The trail, owned by the Sherwood/Elm Grove Trail Association (SEGTA) runs along the northern border of Kingwood, parallel to Woodridge Village. Hundreds of students used it to get to Kingwood Park High School via foot and bicycle. And residents used it to get to shopping in the Northpark Place Commercial District. But not now. Perry Home’s contractors destroyed a section about 500 feet long. And with their construction equipment now gone, only warning signs remain.

Approximate Location of Destroyed Trail

The map below shows the approximate location of the portion of the trail that Perry Homes destroyed. Hikers and bikers must now detour through streets – none of which have sidewalks. That poses a safety hazard.

How Could This Happen?

According to Ethel McCormick of Kingwood Association Management, Friendswood initially built the trail then gave it to SEGTA. However, part of it wandered onto property that Friendswood also owned but did not give to SEGTA. They later sold that adjacent property to Lennar. No one developed the property through seven changes of ownership. Then in 2018, it became Woodridge Village.

Friendswood sold the parcel of land to Lennar in 1994. 24 years later, the wandering trail finally got in the way of Perry Homes/Figure Four Partners plans..

When Perry Home started the new development, surveyors found that the part of the trail was not on SEGTA land but belonged to Perry Homes’ subsidiary, Figure Four Partners. The developer destroyed that part.

However, they intended to reconnect it later when they became part of the Kingwood network. But with Perry Homes apparently abandoning plans to finish the development, the trail’s fate is now in limbo.

The SEGTA Board does not have any information about what will happen at this time, according to McCormick. But it was a major topic of discussion at SEGTA’s last board meeting. 

Perry Homes left abruptly before Christmas without restoring the missing part, removing warning signs or taking down construction fencing.

In the meantime, residents and their children do not have use of the remaining trail on Association property. And they must detour several blocks on streets around the interruption below.

Looking west from a point about a hundred feet west of Fair Grove.
Looking east from a point several hundred feet east of Friarwood Trail toward Fair Grove.

Options for Association

At this point, it appears the Sherwood-Elm Grove Trail association has three options.

  • Move the trail back onto its own property.
  • Abandon it.
  • Hope that Perry Homes or whoever buys this property reconnects it to an expanded trail network.

As of this morning, Perry Homes still had no construction equipment on either the southern or northern sections of Woodridge Village. They only had tree mulching equipment working on the northern portion of the site. With Perry Homes’ intentions unclear, option three could take years.

Posted by Bob Rehak on 12/27/2019

850 Days after Hurricane Harvey and 89 after Imelda

Elm Grove Says Merry Christmas to Perry Homes and Kathy Perry Britton in Strange and Wonderful Ways

Numerous people have sent ReduceFlooding.com stories about how Perry Homes and Kathy Perry Britton changed their Christmas. Some are real and some are just expressions of anger.

Adaptations Reported by Residents This Christmas

Stringing Christmas tree lights three feet up from the floor for safety.

Converting Christmas yard decorations to blow up plastic types that float.

Monitoring radar screens for storms instead of Santa.

Instead of toys, kids get interior doors, Home Depot gift cards, wallboard and wet vacs.

Ornamental reindeer on the roof equipped with scuba gear.

Decorating the dumpster in the front yard.

Isabelle Fleernor’s Vision of a Merry Perry Christmas

Letters to Santa Express Christmas Wishes

Several folks have also shared their letters to Santa:

Dear Santa,
All I want for Christmas is for you to get Perry Homes to finish the job they started so we can be safe.

Dear Santa,

Our elderly neighbors and the children are suffering. So please make Kathy Perry Britton admit her mistakes, apologize and go away.

Dear Santa,

Perry Homes has done nothing to stop flooding since May. Imelda proved that. We need someone who knows what they’re doing to step in and fix things.

CEO Deprived Thousands of Christmas

Yep. You get the idea. The Grinch has nothing on Kathy Perry Britton. The new “Queen of Mean” has already taken homes, Thanksgiving and Christmas from thousands of kids. Ms. Britton could soon take Easter, too. She:

And yet her highly paid PR staff positions her as a business leader. Only in Houston!

This is the stuff of legend. Or delusion. Perhaps we buy her a one-way Greyhound ticket to Guatemala.

No. On second thought, Guatemala is too nice. Other ideas gratefully accepted.

Posted by Bob Rehak on 12/25/2019 with input from Jeff Miller, Isabelle Fleenor and the community

848 Days after Hurricane Harvey and 95 since Imelda

Perry Homes Pulls Excavation Equipment From Woodridge Village Before Finishing Detention Ponds

Instead of accelerating completion of detention ponds on Woodridge Village as Perry Homes promised, the company appears to have pulled all excavation equipment from the site. Contractors who were supposed to have been working on detention pond N-1 have gone…BEFORE they finished S2 and BEFORE they finished a berm sealing off the southern portion of the site at Fair Grove Drive.

S2 Pond Still Not Complete; Does Not Meet Regs

On October 17th, a lawyer for Perry Homes’ subsidiaries sent a letter to the City of Houston Attorney promising that the company would “accelerate” completion of detention ponds. Even though Perry Homes had already substantially completed Detention Pond S2, it took Perry 63 days to restore it to its pre-Imelda condition. Worse, contractors left before the pond met the regulations in Montgomery County’s Drainage Criteria Manual. It still doesn’t have fencing, service roads around its entire perimeter, or grass on its banks. Finally, it holds water when regulations call for a dry bottom.

Equipment Left Site Instead of Beginning On Next Pond

Perry Homes had promised in its letter to accelerate construction, but this will slow it down – if they ever return. The only work being done Friday? Removal of some dead tree piles on the northern portion of the site.

Jeff Miller took all the pictures and videos below on Friday and Saturday. He also monitored work on the site and provided this scouting report.

Looking south toward Taylor Gully and the Harris County Line along the eastern embankment of the S2 detention pond.
The channel along the eastern portion of Taylor Gully is now lined with concrete. The spillway into the S2 detention pond has been widened and smoothed. The S2 detention pond is behind the camera position. Looking East.
Looking west across S2 detention pond. The dirt that eroded into the pond has been scooped back up onto the banks and compacted. Still no grass on the banks, however, so it could all wash back in with the next big rain.
Looking north. The grassy area in the background was supposed to have contained the N3 detention pond. However, contractors have simply excavated a channel from the northern section directly into Taylor Gully so now runoff can accumulate even more quickly.
Contractors widened and concreted the Taylor Gully channel along the eastern side of Woodridge Village. But they left the most vulnerable part of the channel without concrete. At the end corner by the telephone poles, water comes from the left. But no concrete protects the area where the water makes a sharp 120 degree turn. Expect water to erode behind the concrete and peel it away in the next big rain.

Woodridge Village Section One Now a Virtual “Ghost Town”

This weekend, Woodridge Village Section One looked like a ghost town, not a bustling construction site with people working against a deadline.

Heavy construction equipment used to be parked by dumpster in the background. Now it’s nowhere on the property.
Looking south. Another view of the same area that held construction equipment. It’s all gone and the berm sealing the site off from Fair Grove Drive is missing.

Still Removing Dead Trees/Mulch on Northern Section

On Friday, only smaller equipment turning tree piles into mulch remained.

Perry Homes Intentions Now a Mystery

As of Sunday morning 12/22/2019, no equipment actually working on construction could be seen on the site. The excavators and dump trucks parked at Fair Grove for months have been removed.

Perry Homes is NOT accelerating completion of detention ponds as it promised the City of Houston.

Instead, Perry Homes has thrown a curtain of silence around this job. It’s hard to know what their intentions are. At this point, Perry Homes’ lawyer J. Carey Gray has as much mud on his face as Elm Grove residents had in their homes.

The only thing we can say with certainty: Lowering flood risk for the people of Elm Grove does not seem high on Perry Homes’ priority list.

For Sale And For Lease Signs Serve as Christmas Yard Decorations

Meanwhile, a drive down Shady Maple or Village Springs, the two streets that border Taylor Gully, revealed residents’ attempts to salvage Christmas from the chaos of floodwaters. Dumpsters and debris still line the streets. Some people still live in trailers in their driveways. No apple cider around the hearth for them. They’ll be lucky to find space for a table top Christmas tree. For Sale and For Lease signs outnumber Christmas yard decorations ten to one.

On a street called Right Way in North Kingwood Forest, I found nine For Lease signs in a row. Sad reminders of Imelda and Perry Homes. Only three months ago, these homes were filled with families who flooded for the second time.

Kathy Perry Britton just added another credit to her resume, “The CEO Who Stole Christmas.”

Posted by Bob Rehak on 12/22/2019 with reporting and images by Jeff Miller

845 Days since Hurricane Harvey and 94 since Imelda

The thoughts expressed in this post represent opinions on matters of public concern and safety. They are protected by the First Amendment of the US Constitution and the Anti-SLAPP Statute of the Great State of Texas.

Perry Homes’ Brand Just Lost Another Generation

Perry Homes once had a stellar brand image. At least according to Perry Homes. Now that image is lower than whale poop on the bottom of the ocean. Perry Homes managed not only to alienate adult homebuyers, they’ve alienated the next generation, too. Ignoring regulations. Contributing to flooding hundreds of homes – twice. Denying all responsibility. Suing victims. Ignoring commitments. Dragging feet on mitigation. Exposing twice-flooded residents to even more risk! This could go down in the annals of business history as the perfect way to kill a brand.

Two Generations Down the Drain

The worst fate most brands suffer is indifference. But Perry Homes has managed to create a generation of child activists out to expose the indifference of the brand’s managers to flood victims.

Isabelle Fleenor, a student at Kingwood Middle School, created and stars in this YouTube video about how Perry Homes ruined Christmas for so many Elm Grove and North Kingwood Forest residents. It’s called a “Very Un Merry Perry Christmas.”

According to Isabelle’s mother, Isabelle conceived the video, starred in it, edited it, created all the graphics and also made “Dam It Perry Homes” signs and T-shirts. They express the community’s anger and point to a constructive solution. She then took the money she raised from T-shirt and sign sales, and donated it to the Elm Grove fall festival for kids so that they might enjoy Halloween.

When I first saw this video, I said to myself, “This young lady has a future in film, television, or on the stage.” What a presenter! She has energy. She’s articulate. And she has heart! You see, Isabelle and her family did not flood. She did all this work for her neighbors who did flood.

Dam It Perry Homes T Shirt by Isabelle Fleenor from her video.
Screen capture from Isabelle Fleenor’s video.

Merry Christmas, Perry Homes, from the Younger Generation

I highly recommended you take two minutes to watch this video. Especially if your name is Kathy Perry Britton. This is the future of your brand, Ms. Britton. Merry Christmas!

Posted by Bob Rehak on 12/16/2019 based on a video by Isabelle Fleenor

839 Days since Hurricane Harvey and 88 since Imelda

The thoughts expressed in this post represent my opinions and the opinions of Isabelle Fleenor on matters of public policy and safety. They are protected by the First Amendment of the US Constitution and the Anti-SLAPP Statute of the Great State of Texas.