Lauder Basin Phase II on Greens Bayou Under Construction

The long-awaited Lauder Basin Phase II on Greens Bayou is now under construction. In May of last year, the Texas Water Development Board announced a $2.2 million grant to expand the basin.

Lauder Basin Phase II
HCFCD is expanding the basin into the old Castlewood Subdivision east of Aldine Westfield Road.

Then in September, HCFCD announced that construction would be starting “soon.” Harris County Flood Control District (HCFCD) estimated sometime in the fourth quarter of 2022.

Construction Photos Taken 5/7/23

A visit to the job site earlier this week showed that construction is now well underway. See the photos below.

Looking NW. Phase II of the Lauder Basin under construction. Greens Bayou is in upper right. Small creek in foreground is a tributary.

Looking West. Greens Bayou flows toward camera position from upper right to lower right.
Still looking west, but from closer position reveals that HCFCD is excavating area closest to Greens first.
Looking West from farther away reveals proximity of Phase II with two ponds built during Phase I. See diagram below.

Eventually, Phase 2 should have several compartments with water-quality plantings to help filter out pollutants, and a small stream connecting the ponds. This presentation is a bit dated, but shows HCFCD’s plans for the basin as they existed in 2020.

Artists rendering of Phases I and II of Lauder Basin. Plans for Phase II have reportedly changed slightly.

Project Scope

Together, Phases I and II should provide more than 1,200 acre-feet of stormwater storage. HCFCD designed them to fill up during storms to help reduce the risk of Greens from flooding local homes, businesses and schools. After a flood, the basins release excess water slowly when the channel can safely accept it.

Phase II (651 acre feet) will actually provide more stormwater storage than Phase I (588 acre feet).

HCFCD estimates total Phase II construction costs at $32 million and predicts construction could take 2.5 years.

Spending Comparison with Other Watersheds

Greens Bayou has received more than a quarter billion dollars of projects such as these since 2000. That’s more than any other watershed in Harris County with the exception of Brays Bayou – where Commissioner Rodney Ellis lives.

Data obtained from HCFCD by FOIA request. Includes all spending from 1/1/2000 through end of Q1 2023.

Greens Bayou is one of the few watersheds where HCFCD spending did not plummet last quarter. Even as spending decreased in 15 watersheds, it rose in Greens Bayou by almost $4.8 million. To put that in perspective, it increased 11 times more than the watershed with the second largest increase, White Oak, at $431,126.

Here are the actual numbers.

Data obtained from HCFCD via FOIA requests.

No doubt, the activity you see in the photos above had a lot to do with Greens’ ranking. So, does construction on Garners Bayou, a tributary of Greens farther downstream.

Stay tuned for more news as construction progresses.

Posted by Bob Rehak on 5/12/23

2082 Days since Hurricane Harvey

Greens Bayou Mid-Reach Segment Reaches 10-Year Level-of-Service Goal. Now What?

In the Tuesday 8/23/22 Harris County Commissioners Court Meeting, Harris County Flood Control District (HCFCD) will deliver the results of a study on the Greens Bayou mid-reach area. The study shows that when the Aldine-Westfield Phase 2 and Lauder Phase 2 Basins are complete, the area will be protected from a 10-year flood (10% annual chance). But the study doesn’t stop there. It also recommends building another large detention basin and increasing channel conveyance to protect the area in a 25-year flood (4% annual chance).

10-Year Protection Achieved

Back in 2003, HCFCD started working on a plan to bring much needed flood reduction to the area between Veterans Memorial and JFK along Greens. That stretch covers 11 miles of Harris County Precincts 1 and 2.

Since then, four stormwater detention basins have been built along the bayou.

Locations of improvements along Greens Bayou. Red is proposed.

Also since 2003, NOAA has developed new Atlas-14 rainfall probability estimates.

atlas 14 rainfall probabilities
Atlas 14 rainfall probabilities for northern Harris County

The new estimates show that northern Harris County could experience 30-40% more rain than previously estimated in major events. With both rainfall and detention basin capacity increasing, the question became, “Where do things stand?”

This new engineering study shows that the four existing detention basins (Kuykendahl, Glen Forest, Aldine-Westfield and Lauder) should protect homes and businesses in a 10-year flood. But achieving greater protection will require something more.

Four Alternatives to Increase Capacity

Engineers looked at four different alternative combinations of stormwater detention capacity and/or channel conveyance improvements to provide more protection. Each alternative involved the proposed Hardy Stormwater Detention Basin shown in red on the map above.

  • Alternative 1 – Building a 3,000 acre-foot basin
  • Alternative 2 – Smaller 2,000 acre-foot basin with more room for recreation
  • Alternative 3 – Same as #2 but also with channel conveyance improvements
  • Alternative 4 – Only conveyance improvements; no additional storage capacity
  • Alternative 5 – Build nothing else. Stop with existing basins.

The chart below summarizes what they found.

For a description of all alternatives, see the preliminary engineering review. It’s not clear how ranking fits with recommendation.

The engineers recommended Alternative #3 – given sufficient funding. It would achieve a 25-year system capacity in general. The area immediately downstream of I-45 would achieve closer to a 10-year system capacity. And the area immediately downstream of the Hardy Tollroad would be closer to a 50-year capacity.

The proposed and existing improvements would create enough storage to hold a foot of rain falling across 16.4 square miles!

Cost: A mere $196 million on top of the $126 million already invested in the other four basins. Compared to Alternative 5, #3 would protect another 25 structures in a 10-year flood, 173 in a 50-year, and 239 in a 100-year. HCFCD did not list a number for a 25-year event. But we can assume it’s somewhere south of 173.

This HCFCD presentation recommends a phased approach to implementation to accommodate annual funding levels.

  • Phase 1: 3.6 miles of channel conveyance improvements
  • Phase 2: 3.5 miles of channel conveyance improvements and 500 acre-feet of stormwater detention 
  • Phase 3: 3.5 miles of channel conveyance improvements and 500 acre-feet of stormwater detention
  • Phase 4: Final 1,000 acre-feet of stormwater detention

The slide below shows how much the existing and new improvements would shrink the 25-year floodplain. Mentally subtract the purple areas to see before and after.

Purple represents the extent of the floodplain without improvements. Blue shows the extent with improvements.

For the full presentation, click here.

Posted by Bob Rehak on 8/21/2022 based on material from HCFCD

1818 Days since Hurricane Harvey

San Jacinto Flood Planning Group Releases Draft Recommendations

The Texas Water Development Board’s Region 6 San Jacinto Flood Planning Group has released the first draft of its recommendations. You can download the full 295-page Volume One document here (executive summary and all chapters). But the vast majority of the document focuses on methodology and research design. For convenience, I’ve extracted Chapter 5, the 35-pages that discuss recommendations, and summarized them below.

The draft recommendations include:

  • Almost $200 million of additional studies, analysis, models and mapping
  • $27.9 billion in projects.

The projects spread throughout the entire watershed. But here, I’ll focus on those in the northern portion of Harris and the southern portion of Montgomery Counties for brevity.

Halls Bayou

The Flood Planning Group recommends five projects in Halls Bayou totaling $99.65 million, all in collaboration with Harris County Flood Control District (HCFCD). They include:

  • Channel conveyance Improvements on several tributaries
  • Stormwater detention improvements near Hardy West
  • Stormwater detention and channel conveyance improvements along the main stem.

These projects had a positive 1.46 Benefit/Cost Ratio PLUS additional community benefits hard to quantify. They would remove the floodplain from more than 3,000 structures and benefit more than 9,300 people. See pages 5-14 through 5-16.

White Oak Bayou

The Flood Planning Group recommends five channel improvement and detention basin projects for $120 million along White Oak Bayou. The flood planning group determined a benefit/cost ratio of .80 for these projects, meaning costs exceeded benefits. Regardless, they feel there are many community benefits that cannot be quantified. They include removing flood risk from seven miles of roads. See pages 5-15 through 5/18.

Greens Bayou

Greens Bayou would receive $120 million of improvements (construction costs only). They include projects in Fountainview Sections 1 & 2, Castlewood Sections 3 & 4, North Forest, Mid-Reach Greens, Parkland Estates, and Humble Road Place.

A bypass channel under the railroad that parallels US 59 could reduce upstream water surface elevations during extreme events. And a mitigation basin downstream would absorb any adverse impacts in Parkland Estates and Humble Road Place from the bypass channel.

The BCR for all Greens Bayou improvements equals 2.13, meaning benefits double costs. More than 20,000 individuals and 2,000 structures would benefit. See pages 5-18 through 5-20.

San Jacinto River

The Flood Planning Group recommends numerous projects associated with the East and West Forks of the San Jacinto River and their tributaries. It based these recommendations on the San Jacinto River Regional Watershed Master Drainage Plan and a 2018 LiDAR study. See pages 5-21 through 5-31.

Caney Creek

Recommendations include channelizing part of Caney Creek and offsetting that with two dry-dam detention basins: one at FM1097 and the other at SH105. Together, they would store more than 40,000 acre feet of stormwater. That’s enough to hold a foot of stormwater falling across 62.5 square miles! Channelization would occur near the confluence of Caney Creek with the East Fork. That’s near Lake Houston and East End Parks. The projects would remove 42 miles of roadway and 2,422 structures from the 1% annual chance floodplain.

East Fork

A 48-ft tall concrete dam would create a 1.60-mile-long earthen impoundment that captures runoff from Winters Bayou. The dry dam would have five reinforced 10×10 concrete culverts and twin 300′ backup spillways. It would cover almost 2,500 acres and hold 45,000 acre feet of floodwater. That’s enough to hold a foot of stormwater falling over 28.8 square miles.

Lake Creek

Lake Creek would receive some channelization and two dry-dam detention basins holding 37,250 acre feet of storage, enough to hold a foot of stormwater falling over 58 square miles.

Peach Creek

Recommendations also call for partial channelization and two dry-dam detention basins along Peach Creek.

  • The Walker Detention basin would occupy 1,200 acres, hold 36,000 acre feet of stormwater, and cost $200 million.
  • The SH105 Detention basin would occupy 3,000 acres, hold 36,000 acre feet, and cost $400 million.
  • The total 72,000 acre feet of capacity would hold a foot of stormwater falling over 112.5 square miles.
Spring Creek

This project would channelize 15.7 miles of stream at I-45 and through the Woodlands. It would also create two detention basins on Birch and Walnut Creek tributaries to help reduce flood risk downstream. Together, the projects would create more than 35,000 acre feet of floodwater storage capacity, enough to hold a foot of rain falling over 54.8 square miles. The report did not break out the costs.

West Fork

The Flood Planning Group recommends widening and channelizing 5.7 miles of the West Fork near Highway 242. They would create 12,400 acre feet of mitigation storage by widening the river to 750 feet and creating a 2-foot bench above the stream bed. That would involve shaving down the floodplain to 2 feet above the waterline.

Farther downstream, in the Kingwood Area, they would also increase conveyance by widening a 5-mile-long stretch of the West Fork with 3,500-foot wide of benching. This project would require 923 acre-feet of mitigation storage

That would increase total floodwater storage in both locations by 13,423 feet – enough to hold a foot of rain falling across 20.9 square miles.

Is It Enough?

If all these detention basins get built, they could hold a foot of stormwater falling over 337.5 square miles upstream from Kingwood. That’s a lot. In conjunction with other strategies such as dredging and adding more floodgates to the Lake Houston dam, they should help reduce flood risk in the Lake Houston Area … if they aren’t negated elsewhere.

Other portions of the recommendations stress the need for additional strategies. They include but are not limited to:

  • A regional approach to flood mitigation
  • Floodplain preservation
  • Natural solutions
  • Minimum building setbacks
  • More stringent building codes
  • Better drainage regulations
  • Uniform regulations across the watershed
  • Adoption of standards for determining “no adverse impact”

Also note, that these recommendations would take decades to implement and that many would need to be implemented in a specific order. For instance, the State would need to build detention upstream before widening channels downstream. One helps mitigate the other. Without that, you could help people upstream, but hurt people downstream. That flies in the face of HCFCD principles.

To see the locations of all these streams and how much water they conveyed during Harvey, click here.

Posted by Bob Rehak on 8/8/22

1805 Days since Hurricane Harvey

Where Flood-Bond Spending Is Going, When New Flood Maps Will Be Released

On the Harris County Commissioner’s Court agenda for today are two Harris County Flood Control District (HCFCD) “transmittals.” One will update commissioners on flood-bond spending to date. The other will update commissioners on the progress of new flood maps (the MAAPnext program). They are items 269 and 270 on today’s agenda.

Transmittals are reports by departments. Commissioners don’t usually discuss them unless one of the commissioners wishes to make comments for some reason. So, I’m calling them to your attention here.

Flood-Mitigation Spending Through Third Quarter Reaches $865 Million

About half of the $865 million spent on flood mitigation since voters passed the bond in 2018 has come from bond funds. The rest has come from grants and local partnerships. See pie chart below on left.

The left pie chart underscores the importance of partnership funding.

The map below shows where flood-bond spending has occurred.

Flood-mitigation spending by watershed since approval of flood-bond in 2018.

The winner in the $weep$take$: HCFCD spent almost $154 million on Brays Bayou.

Other leading watersheds (rounded to nearest million) in flood-bond spending included:

  • $81 million in Addicks Reservoir
  • $76 million on Greens Bayou
  • $76 million on Cypress Creek
  • $50 million on Little Cypress Creek
  • $46 million on White Oak Bayou
  • $32 million on Clear Creek

With a few exceptions, this spending reflects the influence of the Harris County Flood-Bond Equity Prioritization Framework implemented in 2019. That framework gives highest priority to low- to middle-income watersheds with a high social-vulnerability index. Thus, tiny Halls Bayou has received more assistance than the largest watershed in the county – the San Jacinto River. And Brays Bayou has received almost 11 times more assistance than Buffalo Bayou.

Two notable exceptions are:

  • Vince Bayou which is almost totally inside the City of Pasadena and is therefore primarily Pasadena’s responsibility.
  • Little Cypress Creek which is part of HCFCD’s experimental Frontier Program. The Frontier Program aims to prevent future flooding by buying up land on the cheap before it’s developed. HCFCD then sells detention basin capacity to developers to help make back its investment.

Other Insights Gained from Report

  • Most projects are ahead of schedule and on budget. Good news!
  • More than half of buyouts have been completed and enough funding apparently remains to complete the rest.
  • Progress continues on the $124 million FEDERAL Flood Damage Reduction project on White Oak Bayou, where six stormwater detention basins will hold almost a billion gallons of stormwater. That’s equivalent to about a foot of stormwater falling over almost 5 square miles.
  • No actual projects in the Kingwood Area have begun construction yet. However, the Excavation and Removal Project on Woodridge Village could soon begin.

Additional maps in the full report show:

  • Dollars funded to date by watershed (Note, for instance, another $47 million in funding already committed to Brays).
  • Active Maintenance projects
  • Active Capital projects

Also, a massive GANNT chart shows the stages of every project in every watershed and county-wide projects.

Check out the full report here.

Controversy over Previous Version of Report

An earlier version of this report generated some controversy. People in some watersheds didn’t believe the reported expenditures. Members of the Northeast Action Collective questioned whether any projects had started in their watersheds. They demanded immediate cancellation of projects in Kingwood and transfer of Kingwood’s funds, so that projects in Halls and Greens Bayou could start immediately.

That’s, in part, why I wrote “How to Find and Verify Flood-Related Information: Part I.” Flood-mitigation projects are hard to spot from the ground. Construction almost always happens out of sight behind tall fences and dense tree lines. After construction, the projects are often disguised as parks. For those who doubt, I recommend confirming the existence of projects from the air.

I haven’t confirmed every project in the county, but I have spot-checked many. And I have yet to find discrepancies between what HCFCD reports and what I can see from the air.

C-25, a Halls Bayou Detention pond now under construction by HCFCD
C-25, a Halls Bayou Detention pond now under construction by HCFCD. The bayou runs through the trees in the foreground.
flood detention basin
New basin at Hopper and US59 on a tributary of Halls Bayou.
Lauder Detention Basin on Greens Bayou as of 10/12/2021
Lauder Detention Basin on Greens Bayou as of 10/12/2021. Phase One of a two-phase project is nearly complete.
Cutten Road detention basin on Greens Bayou continues its relentless expansion.
Phase 2 Aldine Westfield Basin
Phase 1 of the Greens Bayou Aldine-Westfield Basin on left is complete. Phase 2 on right is now beginning.

For more information that includes watershed spending data before the flood-bond, check out the funding page.

MAAPnext Effort About to Be Turned Over to FEMA

Harris County Flood Control (HCFCD) estimates it has completed 86% of its part of the flood-map updates. HCFCD will deliver drafts of the new maps to FEMA in January for review and kick off a campaign of public meetings at the same time. The public will see draft maps in February. A public comment period of 90 days will follow. And FEMA hopes to release preliminary flood insurance insurance rate maps by mid-year next year.

I have had a peek at the new maps and reports. And I must say, the effort should result in a dramatic leap forward in flood-risk understanding. Individualized reports will inform homeowners of their flood risks from a variety of different sources, including street flooding. The prototype of the website is very user friendly.

After receiving preliminary maps from HCFCD, it typically takes FEMA another 18-24 months to release final, official flood maps. That gives affected property owners time to comment and appeal. The process looks like this.

MAAPnext milestones as of the end of 2021.

Posted by Bob Rehak on 11/30/2021

1554 Days since Hurricane Harvey

HCFCD Continues Relentless Expansion of Cutten Basin on Greens Bayou

Where Greens Bayou cuts across the northwest corner of Beltway 8 and 249, Harris County Flood Control District is expanding its Cutten Regional Stormwater Detention Basin.

Location of HCFCD’s Cutten Floodwater Detention Basin
The basin includes 5 separate Basin Compartments (BCs). One is on the north side of the Bayou (BC5) and four are on the south side (BC1-4).

The $16.2 million expansion will add 866 acre-feet of stormwater storage capacity to the previous 677 acre-feet. That’s enough to lower the water surface elevation by .36 feet throughout the surrounding floodplain.

When complete, the 235-acre complex will have enough capacity to hold a foot of stormwater falling over 2.4 square miles.

Photos Taken 10/15/2021 Show Current Construction Status

Looking E at the extension of Greens Road between BC3 (right) and BC4 (left). Red line indicates path of culvert under roadbed.
Looking W in opposite direction. Greens Bayou is on right. Greens Road (coming from top of frame) will be extended south along ridge that bisects BC3 and BC4 in foreground. BC1 and BC2 are in background on either side of Greens Road. Hollister cuts through the frame from left to right.
Looking NW across Hollister toward yet another detention pond, BC5.
Looking SW across the intersection of Hollister (left) and Greens Road (right). Excavation of BC1 still has a way to go. On Friday, muddy conditions were slowing down the work, but if you look closely, you can still see heavy equipment working in the distance.

How Ponds Will Work with Bayou, Surrounding Developments

These ponds will function two ways. They will take stormwater:

  • Out of Greens Bayou when it starts to overflow.
  • Directly from surrounding subdivisions before it gets into the bayou.

This presentation describes more about the Cutten Basin.

It’s important to understand that County/Municipal neighborhood drainage and HCFCD infrastructure often pre-date current building and development codes, as they do in this area.

As cities and precincts re-grade and reconstruct streets with more and bigger storm sewers that get water out of neighborhoods faster, that water needs a place to go – without flooding others downstream.

In this area, these ponds will be that place. Everything has to work together. The very first sentence of the Texas Water Code Section 11.086 states, “No person may divert … surface waters in this state … in a manner that damages the property of another…”

Stormwater detention basins like these also provide greenspace and recreational opportunities, such as public parks.

HCFCD expects to complete the Cutten Project in the summer of 2022.

Cutten Basin Size in Perspective

To put the size of this basin in perspective, it roughly equals the size of Woodridge Village. Woodridge is the aborted Perry Homes development in Montgomery County. HCFCD purchased it earlier this year to build a regional Stormwater Detention Basin on Taylor Gully in the Porter/Kingwood area.

The Woodridge site already contains five small detention ponds and HCFCD has room in the center to add more. Perhaps the Woodridge site will look somewhat like this one before things are all over.

Cutten is one of six detention basins (Cutten, Antoine, Kuykendahl, Glen Forest, Aldine-Westfield, Lauder) either recently constructed or almost constructed by the Army Corps and HCFCD in the mid and upper reaches of Greens Bayou. HCFCD is also studying a number of flood mitigation projects on the lower reaches of Greens.

Posted by Bob Rehak on 10/16/2021

1509 Days after Hurricane Harvey and 758 since Imelda

Aldine-Westfield Detention Basin Phase 2 Construction Starting Along Greens Bayou

In April this year, I posted about Harris County Flood Control District’s (HCFCD) completion of the Aldine-Westfield Detention Basin Phase 1 along Greens Bayou. Now construction of Phase 2 is starting. It’s currently in the clearing phase.

The basin sits east of Aldine-Westfield Road at Beltway 8 North just south of Bush Intercontinental Airport.

Aldine Westfield Basin layout
Aldine-Westfield Basin location

Photos from April and October

Here’s how that looks from the air.

Looking NE from over Beltway 8 and Aldine-Westfield Road in a helicopter in May. Phase 1 in foreground had just been completed. Red rectangle indicates approximate location of Phase 2 which had not yet started. Note airport in background and Greens Bayou in foreground.

I didn’t have a helicopter this morning and I wasn’t able to safely launch a drone because of air traffic. However, I did manage to grab some ground-level shots from the entrance to the Phase 2 construction site on Aldine-Westfield road.

Photo taken on 10/15/2021 from Aldine-Westfield Road shows that clearing of Phase 2 has begun. The site is currently in the clearing phase.

The photo above was actually stitched together from seven shots in Photoshop. In person, the area cleared looks much larger than it does above. Here’s another shot of the area taken from the air back in April that better shows its size.

Photo of Phase 2 area (right) taken in April this near. Note the pipeline corridor (left of center) that bisects the property.

About HCFCD’s Excavation and Removal Program

HCFCD has owned both portions of this site for years. They have been part of the District’s Excavation & Removal Program since 2005. The program lets contractors take and use dirt from the site for other projects outside of the floodplain – at no cost to the District or taxpayers.

Now, however, the Aldine-Westfield project is kicking into higher gear thanks to 2018 flood-bond dollars.

Details About Aldine Westfield Project

This two-phase stormwater detention basin will reduce the risk of flooding in the mid-reach stretch of Greens Bayou by taking in excess stormwater during heavy rain events and then releasing it slowly back to the channel when the threat of flooding has passed.

Phase 1 holds approximately 667 acre-feet of stormwater and Phase II will hold another 600 acre-feet. Two 5’x4′ reinforced concrete boxes will connect the two phases and outfalls into Greens Bayou.

Together, the two basins will have enough capacity to hold a foot of rain falling over 2 square miles.

Phase 1 cost $7.4 million and Phase 2 will cost $12.2 million, for a total of almost $20 million.

Part of Larger Greens Bayou Plan

The Aldine Westfield Stormwater Detention Basin is part of a comprehensive flood risk reduction plan for the mid-reach stretch of Greens Bayou. That plan includes construction of 11 miles of channel conveyance improvements and four stormwater detention basins:

This presentation, created a little more than a year ago, describes how the improvements discussed above will work in conjunction with several other subdivision and bayou drainage improvements.

The subdivision drainage improvements will be handled by the Harris County Engineering Department. They include increasing the capacity of storm sewers and curb inlets, repairing outfall pipes, and reconstructing roadside ditches. In the Humble area, subdivisions scheduled for the improvements include Fountainview Sections 1 & 2, Humble Road Place, and Parkland Estates. These subdivisions are just south of Beltway 8 near US59.

Areas Removed from 10- and 25-Year Floodplains

This community presentation from 2019 explains more about the benefits. It includes the two maps below.

The light blue shows areas that will be REMOVED from the 10-year floodplain. The dark blue shows areas that will remain in it.
Likewise, light blue represents areas REMOVED from the 25-year floodplain.

Posted by Bob Rehak on 10/15/2021

1508 days since Hurricane Harvey and 757 since Imelda

Phase I of Giant Lauder Detention Basin on Greens Bayou Nears Completion

Phase I of the giant Lauder Detention Basin on Greens Bayou is nearing completion. The 90-acre Phase I of the project will cost approximately $18 million when complete. Excavation and grading are now finished but landscaping still remains on the to-do list for most of the site. It’s come a long way since I photographed this project in July.

Harris County Flood Control District gave this project the name C34. It’s project ID is P500-06-00-E005. These alpha-numeric descriptions do little to communicate the beauty of this massive pond complex. See below.

Phase I Lauder Basin Photos Taken 10/12/21

Looking south from over Greens Bayou (right). HCFCD contractors have begun to plant grass, but much still remains to plant including trees. Also, the ponds will have aquatic plants that improve water quality.
Looking north from north pond. Culverts will convey stormwater at a controlled rate from ponds to Greens Bayou at top of frame. The cut through the tree line by the bayou appears to be an overflow spillway.
Water flows from one pond into another within the 90-acre complex.
Looking south toward Lauder from north end of pond. That’s JFK Blvd. in the upper left.
Looking south from the Lauder Road entrance to the pond complex in Phase 1. That’s Aldine ISD’s Mead Middle School in the background. Note the drainage ditch running off into the distance and read the caption below.
Looking north from Lauder Road. Notice how water from the ditch above (P138-01-01 in map below) is channeled into ponds now at the lower left instead of going directly to Greens Bayou. Also note excavation equipment being loaded on flatbed trucks for removal.

The Flood Control District has received an $11.5 million grant from the U.S. Natural Resources Conservation Service to help construct these ponds.

Phase II Still Being Designed

The detention basin shown above was purchased by the Flood Control District as undeveloped land in 2000. However, Phase II required buyouts.

Looking west from over Phase I. Phase II when complete will occupy the wooded area in the upper right.
Phase 1 is on right (E005), Phase 2 on left (E006). Phase 1 is in its final stages. Phase 2 is still in the design phase. Notice how each pond detains water from long channels before releasing it into Greens Bayou.

Phase II is immediately west of Phase I. It will be located on the property of the former Castlewood Subdivision, Sections 1 and 2. HCFCD completed preliminary engineering for Phase 2 in January 2021. The project is now in the design phase. It is budgeted for $20.5 million and scheduled to start construction in the summer of 2022.

Castlewood was built in the early 1960s in the Greens Bayou floodplain. It was also built in a former floodway of Greens Bayou before the bayou was rerouted and straightened circa the 1950s. Development occurred many years before the advent of Harris County’s first floodplain maps and associated development regulations in the 1980s. Since the late 1970s, there have been more than a dozen recorded flood events in the area.

Artist’s rendering of pond layouts from HCFCD community presentation. When complete, these basins will offer healthy recreational opportunities for area residents.

Together, Phases 1 & 2 comprise more than 200 acres – an area about 25% larger than Kingwood’s largest park – East End Park.

When complete, the ponds in both phases will have enough capacity to hold a foot of water falling across a two-square mile area. That’s water that won’t be going into Greens Bayou immediately during a big storm.

Posted by Bob Rehak on 10/14/2021

1507 Days since Hurricane Harvey

Changes to ReduceFlooding: New “Funding” Page

I have made two major changes to ReduceFlooding.com by adding a new page dedicated to “Funding” and removing the “High Rise” page from the menu.

High-Rise Issue No Longer Topical, Funding Is

Funding is a hot topic at the moment and the high-rise battle is over…at least for now. Even though I removed the high-rise page from the menu, I did not delete it. Historical researchers can still find it by searching for “High Rise.” If the topic becomes active in the future, I will restore it to the menu again.

The Funding Page contains links to every funding post since 2019 when the equity debate first arose and commissioners adopted an “equity prioritization framework.” That framework put projects in low-to-moderate-income watersheds at the front of the line. And now some are trying to cancel projects in affluent watersheds to send more money to low-income watersheds that have already received hundreds of millions of dollars.

Learn Where Your Money is Going

The Funding page is broken into two parts. The left contains a summary of the equity debate and how it has evolved in the last three years. It also contains links to the volumes of data obtained from Harris County via Freedom-of-Information-Act requests, as well as statistical analysis of the data. The right part contains links to every related post published since the equity debate started.

Collecting all information related to funding in one place should make it easy for people to find information about their watersheds and where their money is going.

Please explore and send me feedback. I’m always eager to make ReduceFlooding better. And if you see information in the media that is demonstrably false, please send them to the Funding page to find the real data.

Posted by Bob Rehak on 7/29/2021

1430 Days since Hurricane Harvey

The thoughts expressed in this post represent opinions on matters of public concern and safety. They are protected by the First Amendment of the US Constitution and the Anti-SLAPP Statute of the Great State of Texas.

Lauder Basin: Another Flood-Mitigation Project that Doesn’t Exist According to Some

On Lauder Road west of JFK, Harris County Flood Control District (HCFCD) has been building a detention basin next to Greens Bayou. This is another one of those detention basins that doesn’t exist, according to some politicians and community activists. Even though the politicians voted to fund the projects, and the projects are well underway, those same politicians claim that all of the flood-bond money is going to richer watersheds because of the higher home values.

Watershed with Second Most Funding Since Harvey Allegedly has None

In reality, the Greens Bayou watershed has received almost $300 million in funding since 2000. Half of that ($156.8 million) has come since Harvey.

Only one other watershed has received more HCFCD funding since Harvey.

Data Obtained Via FOIA Request from Harris County.

$38.5 Million Going to Lauder Basin

By the time Phases I and II are complete, the detention ponds will hold 1,600 acre-feet of of stormwater. That’s enough to hold a foot of rain falling across two and a half square miles.

According to HCFCD’s website, construction on Phase I should finish by the end of this year. Phase II should start next year. The two projects have a combined budget of $38.5 million.

If you don’t believe the Flood Control District website, check out Google Earth, or the satellite views in Google Maps and Apple Maps. This project is so big, you can see it from outer space.

Satellite image from Google Earth taken on 11/16/2000. Phase I construction has advanced considerably since then. See below.

The following photos were all taken on Sunday, 7/25/2021, around noon.

HCFCD Lauder Detention Basin Phase I. Looking north across Lauder towards Greens Bayou in background and Bush Intercontinental Airport in distance.
NE corner of HCFCD Phase I Lauder Detention Basin, looking east towards JFK Blvd, just south of Greens Bayou.
Looking south from over Greens Bayou toward Lauder and the Aldine ISD Mead Middle School in distance.
HCFCD Lauder Detention Basin on Greens Bayou. Excavation is now focusing on the pond closest to Lauder in the distance. When I last photographed this basin in April, the area for that last pond was being cleared.
Phase II will be built in the wooded area beyond the current Phase I construction.

Still Don’t Believe the Project Exists?

Think the photos are some kind of Photoshop trick? Visit the site yourself. Construction is bustling. On Sunday, around noon, I watched dozens of trucks coming and going while I took the photos above. Here’s how to get there.

Lauder Detention Basin location

Counterfeiting the Currency of Communication

The bizarre thing about this project is that the politicians who say it doesn’t exist are the ones who funded it. Go figure. Such is the sad, sorry state of politics in America today.

I’ve even talked to professors, professional engineers, MBAs, and PhDs in engineering who claim this and similar projects in Halls and Greens Watersheds don’t exist!

Worse yet, they refuse to look at the pictures, go to the construction site, review Flood Control’s website, or trust audited county spending data.

Language is the currency of communication. It’s how we cooperate. How we get things done. It’s one thing to disagree over project priorities. But another to claim projects don’t even exist when they do.

As a consequence, public policy has become divorced from reality. This is worse than being duped by misinformation. It’s the unwillingness of people, even including some journalists, to review available information that helps the public make informed decisions. And it doesn’t bode well for your region.

Posted by Bob Rehak on 7/28/2021

1427 Days since Hurricane Harvey

Baseless Claims of Historic Racism, White Supremacy in Allocation of Flood Funds

Members of the Northeast Action Collective (NAC) have falsely alleged “historic racism” in the allocation of flood-mitigation funds. And without evidence, the group also cited “a rising white supremacist movement” in Harris County as a reason to move money from high-income to low-income watersheds “as quickly as possible.”

Analysis of historical funding data obtained from Harris County via a Freedom of Information Act (FOIA) Request shows that minority and low-income watersheds have received the lion’s share of funds since 2000. Yet at the 6/29/21 Harris County Commissioners Court meeting, NAC members claimed the opposite.

From Baseless to Bizarre

“Historic racism” and “white supremacy” were just two of dozens of baseless and bizarre claims in the group’s manifesto.

NAC also claimed that:

  • It is “fighting for better drains and more regular drain upkeep.” NAC then blames the Harris County Flood Control District (HCFCD) for being insensitive to residents needs. Perhaps that’s because HCFCD is not responsible for street drainage; the City and (in unincorporated areas of Harris County) Precinct Commissioners are.
  • “The City won’t pay attention to neighborhoods where Black and Brown people live” … even as they complained to County Commissioners.
  • HCFCD has “underfunded” Greens and Halls Bayous for decades while ignoring the fact that the entire county was underfunded before the 2018 flood bond.
  • HCFCD needs more transparency, even though NAC ignored readily available information about HCFCD spending.
  • The flood bond was supposed to counteract historic racism, even though the language approved by voters never mentions race.

These claims deserve closer scrutiny. Let’s look at some of the most serious falsehoods.

Racial Equity Not in Flood-Bond Language

NAC claims the flood-bond promised racial equity in the distribution of funds; it didn’t. The text of the flood bond never mentions race, minorities, historic underinvestment, income, social justice, social vulnerability or any of the other things NAC says it does. Those concepts were all heaped onto the one mention of “equitable” in the bond language (paragraph 14G). It puts equity in a geographic context with a prefatory clause focused on political boundaries. (“Since flooding issues do not respect jurisdictional or political boundaries, the Commissioners Court shall provide a process for the equitable distribution of funds…).

Areas, such as Lake Houston, asked to include that because flood mitigation requires upstream detention in other counties. The inability to cross political boundaries for flood mitigation would handicap areas near the county line forever.

Historic Racism Not Evident in Funding

NAC claims “historic racism” in flood mitigation funding, but refuses to acknowledge historic advantages in funding:

  • Eight minority and low-income watersheds (out of 23 total) received 71% of all HCFCD capital funds between 2000 and Harvey. ($1.1 billion out of $1.5 billion.) The other 15 higher income watersheds split the remaining $400 million. So “historic racism” in funding does not exist, at least not in Harris County and not at HCFCD. See links to data and related articles below.
  • Out of 23 watersheds, Halls and Greens Bayou Watersheds alone received $222 million between 2000 and Harvey. That’s 15% of all funding during those years.
  • They also received another $200 million out of $1.1 billion spent since Harvey – 18%.
HCFCD Capital-Improvement Spending between 2000 and Harvey arranged by percentage of low-to-moderate income (LMI) residents. Halls has the highest LMI % and Little Cypress the lowest. The top eight watersheds (darker blue) have LMI percentages above 50%; the others below. Data obtained via FOIA request.
New detention basin at Hopper and US59, photographed in April. One of four new basins in the Halls Bayou watershed that doesn’t exist according to NAC.

“Rising White Supremacist Movement” Not Seen in Funding or Evidence

NAC claims, “The most viable path to equity is to reallocate money for projects in wealthier watersheds to projects in watersheds with predominantly BIPOC and LMI residents.” (BI-POC stands for Black, Indigenous and People of Color. LMI stands for Low-to-Moderate Income.) But NAC doesn’t stop there.

Because of “a rising white supremacist movement in Texas and the county, and decades of underinvestment, the only strategy rooted in justice is to move as much money as quickly as possible to low-income watersheds.”

Northeast Action Coalition

Then NAC claims that its members do not believe that “current HCFCD leadership is actually committed to racial equity or justice.” I guess they don’t get out in the neighborhood much and look at all the flood-mitigation projects going in!

One of three new detention basins under construction in the Greens Bayou Watershed. It doesn’t exist either according to NAC.

Demand for Transparency That Already Exists

The NAC manifesto also demands, “full transparency on spending.” Yet:

  • HCFCD supplied historical funding data going back more than two decades. NAC and partner organizations ignored it.
  • All HCFCD spending is audited.
  • HCFCD’s website details spending and projects in each watershed.
  • It also shows – by watershed – all active construction and maintenance projects, and their value.
  • All HCFCD expenditures are approved by Commissioners in open, public meetings.

When Commissioners Ellis and Garcia claim that all the funding is going to rich watersheds and none to poor watersheds, they should know better. They approved all the money going to low-income areas!

The Real Problem

In the 18 years between 2000 and Harvey, the Flood Control District had only $1.5 billion to spend on capital improvement projects. Even with partner funding, that works out to only a little more than $80 million per year. According to multiple sources, for decades HCFCD had to save up money – sometimes for years – to afford construction projects. So, in some years, there were NO flood-mitigation projects at all, anywhere in the county.

Despite that, eight LMI watersheds received $1.1 billion out of $1.5 billion total dollars. That’s 71% of all capital spending – hardly “historic racism” or evidence of “white supremacy.” The other 15 more affluent watersheds combined got only 29%.

The sad fact is that no one in Harris County got enough flood-control dollars to prevent flooding before Harvey. It took Harvey to wake voters up to the need for better flood control.

In fairness, as I have shown in related articles below, minority, low-income watersheds did suffer a disproportionate share of damage in the last two decades. But dollars have flowed to that damage. Those damaged communities have received the vast majority of flood-mitigation funds.

Halls and Greens didn’t flood because of racism. And shouting racism from the rooftops won’t fix their flooding problems. It will only cloud issues and divide people.

For More Information

In early March, I submitted a FOIA request to Harris County for capital improvement funds by watershed dating back to 2000. Here is the county’s response: HCFCDs historical construction funding by watershed.

I then compiled a summary spreadsheet that includes related information, such as population and watershed size, also supplied by the County in response to my FOIA request.

After analysis, I published these findings:

Also, here are several articles with aerial photos that show what the money bought.

Finally, here’s an article about how Commissioner’s filled a potential shortfall in partnership funds to prevent possible delays in construction of flood mitigation projects. Trust To Fully Fund Flood Mitigation Projects Without Partner Assistance For At Least Next Six Years.

Posted by Bob Rehak on July 7, 2021

1408 Days after Hurricane Harvey

The thoughts expressed in this post represent opinions on matters of public concern and safety. They are protected by the First Amendment of the US Constitution and the Anti-SLAPP Statute of the Great State of Texas.