HCFCD Continues Relentless Expansion of Cutten Basin on Greens Bayou

Where Greens Bayou cuts across the northwest corner of Beltway 8 and 249, Harris County Flood Control District is expanding its Cutten Regional Stormwater Detention Basin.

Location of HCFCD’s Cutten Floodwater Detention Basin
The basin includes 5 separate Basin Compartments (BCs). One is on the north side of the Bayou (BC5) and four are on the south side (BC1-4).

The $16.2 million expansion will add 866 acre-feet of stormwater storage capacity to the previous 677 acre-feet. That’s enough to lower the water surface elevation by .36 feet throughout the surrounding floodplain.

When complete, the 235-acre complex will have enough capacity to hold a foot of stormwater falling over 2.4 square miles.

Photos Taken 10/15/2021 Show Current Construction Status

Looking E at the extension of Greens Road between BC3 (right) and BC4 (left). Red line indicates path of culvert under roadbed.
Looking W in opposite direction. Greens Bayou is on right. Greens Road (coming from top of frame) will be extended south along ridge that bisects BC3 and BC4 in foreground. BC1 and BC2 are in background on either side of Greens Road. Hollister cuts through the frame from left to right.
Looking NW across Hollister toward yet another detention pond, BC5.
Looking SW across the intersection of Hollister (left) and Greens Road (right). Excavation of BC1 still has a way to go. On Friday, muddy conditions were slowing down the work, but if you look closely, you can still see heavy equipment working in the distance.

How Ponds Will Work with Bayou, Surrounding Developments

These ponds will function two ways. They will take stormwater:

  • Out of Greens Bayou when it starts to overflow.
  • Directly from surrounding subdivisions before it gets into the bayou.

This presentation describes more about the Cutten Basin.

It’s important to understand that County/Municipal neighborhood drainage and HCFCD infrastructure often pre-date current building and development codes, as they do in this area.

As cities and precincts re-grade and reconstruct streets with more and bigger storm sewers that get water out of neighborhoods faster, that water needs a place to go – without flooding others downstream.

In this area, these ponds will be that place. Everything has to work together. The very first sentence of the Texas Water Code Section 11.086 states, “No person may divert … surface waters in this state … in a manner that damages the property of another…”

Stormwater detention basins like these also provide greenspace and recreational opportunities, such as public parks.

HCFCD expects to complete the Cutten Project in the summer of 2022.

Cutten Basin Size in Perspective

To put the size of this basin in perspective, it roughly equals the size of Woodridge Village. Woodridge is the aborted Perry Homes development in Montgomery County. HCFCD purchased it earlier this year to build a regional Stormwater Detention Basin on Taylor Gully in the Porter/Kingwood area.

The Woodridge site already contains five small detention ponds and HCFCD has room in the center to add more. Perhaps the Woodridge site will look somewhat like this one before things are all over.

Cutten is one of six detention basins (Cutten, Antoine, Kuykendahl, Glen Forest, Aldine-Westfield, Lauder) either recently constructed or almost constructed by the Army Corps and HCFCD in the mid and upper reaches of Greens Bayou. HCFCD is also studying a number of flood mitigation projects on the lower reaches of Greens.

Posted by Bob Rehak on 10/16/2021

1509 Days after Hurricane Harvey and 758 since Imelda

Aldine-Westfield Detention Basin Phase 2 Construction Starting Along Greens Bayou

In April this year, I posted about Harris County Flood Control District’s (HCFCD) completion of the Aldine-Westfield Detention Basin Phase 1 along Greens Bayou. Now construction of Phase 2 is starting. It’s currently in the clearing phase.

The basin sits east of Aldine-Westfield Road at Beltway 8 North just south of Bush Intercontinental Airport.

Aldine Westfield Basin layout
Aldine-Westfield Basin location

Photos from April and October

Here’s how that looks from the air.

Looking NE from over Beltway 8 and Aldine-Westfield Road in a helicopter in May. Phase 1 in foreground had just been completed. Red rectangle indicates approximate location of Phase 2 which had not yet started. Note airport in background and Greens Bayou in foreground.

I didn’t have a helicopter this morning and I wasn’t able to safely launch a drone because of air traffic. However, I did manage to grab some ground-level shots from the entrance to the Phase 2 construction site on Aldine-Westfield road.

Photo taken on 10/15/2021 from Aldine-Westfield Road shows that clearing of Phase 2 has begun. The site is currently in the clearing phase.

The photo above was actually stitched together from seven shots in Photoshop. In person, the area cleared looks much larger than it does above. Here’s another shot of the area taken from the air back in April that better shows its size.

Photo of Phase 2 area (right) taken in April this near. Note the pipeline corridor (left of center) that bisects the property.

About HCFCD’s Excavation and Removal Program

HCFCD has owned both portions of this site for years. They have been part of the District’s Excavation & Removal Program since 2005. The program lets contractors take and use dirt from the site for other projects outside of the floodplain – at no cost to the District or taxpayers.

Now, however, the Aldine-Westfield project is kicking into higher gear thanks to 2018 flood-bond dollars.

Details About Aldine Westfield Project

This two-phase stormwater detention basin will reduce the risk of flooding in the mid-reach stretch of Greens Bayou by taking in excess stormwater during heavy rain events and then releasing it slowly back to the channel when the threat of flooding has passed.

Phase 1 holds approximately 667 acre-feet of stormwater and Phase II will hold another 600 acre-feet. Two 5’x4′ reinforced concrete boxes will connect the two phases and outfalls into Greens Bayou.

Together, the two basins will have enough capacity to hold a foot of rain falling over 2 square miles.

Phase 1 cost $7.4 million and Phase 2 will cost $12.2 million, for a total of almost $20 million.

Part of Larger Greens Bayou Plan

The Aldine Westfield Stormwater Detention Basin is part of a comprehensive flood risk reduction plan for the mid-reach stretch of Greens Bayou. That plan includes construction of 11 miles of channel conveyance improvements and four stormwater detention basins:

This presentation, created a little more than a year ago, describes how the improvements discussed above will work in conjunction with several other subdivision and bayou drainage improvements.

The subdivision drainage improvements will be handled by the Harris County Engineering Department. They include increasing the capacity of storm sewers and curb inlets, repairing outfall pipes, and reconstructing roadside ditches. In the Humble area, subdivisions scheduled for the improvements include Fountainview Sections 1 & 2, Humble Road Place, and Parkland Estates. These subdivisions are just south of Beltway 8 near US59.

Areas Removed from 10- and 25-Year Floodplains

This community presentation from 2019 explains more about the benefits. It includes the two maps below.

The light blue shows areas that will be REMOVED from the 10-year floodplain. The dark blue shows areas that will remain in it.
Likewise, light blue represents areas REMOVED from the 25-year floodplain.

Posted by Bob Rehak on 10/15/2021

1508 days since Hurricane Harvey and 757 since Imelda

Phase I of Giant Lauder Detention Basin on Greens Bayou Nears Completion

Phase I of the giant Lauder Detention Basin on Greens Bayou is nearing completion. The 90-acre Phase I of the project will cost approximately $18 million when complete. Excavation and grading are now finished but landscaping still remains on the to-do list for most of the site. It’s come a long way since I photographed this project in July.

Harris County Flood Control District gave this project the name C34. It’s project ID is P500-06-00-E005. These alpha-numeric descriptions do little to communicate the beauty of this massive pond complex. See below.

Phase I Lauder Basin Photos Taken 10/12/21

Looking south from over Greens Bayou (right). HCFCD contractors have begun to plant grass, but much still remains to plant including trees. Also, the ponds will have aquatic plants that improve water quality.
Looking north from north pond. Culverts will convey stormwater at a controlled rate from ponds to Greens Bayou at top of frame. The cut through the tree line by the bayou appears to be an overflow spillway.
Water flows from one pond into another within the 90-acre complex.
Looking south toward Lauder from north end of pond. That’s JFK Blvd. in the upper left.
Looking south from the Lauder Road entrance to the pond complex in Phase 1. That’s Aldine ISD’s Mead Middle School in the background. Note the drainage ditch running off into the distance and read the caption below.
Looking north from Lauder Road. Notice how water from the ditch above (P138-01-01 in map below) is channeled into ponds now at the lower left instead of going directly to Greens Bayou. Also note excavation equipment being loaded on flatbed trucks for removal.

The Flood Control District has received an $11.5 million grant from the U.S. Natural Resources Conservation Service to help construct these ponds.

Phase II Still Being Designed

The detention basin shown above was purchased by the Flood Control District as undeveloped land in 2000. However, Phase II required buyouts.

Looking west from over Phase I. Phase II when complete will occupy the wooded area in the upper right.
Phase 1 is on right (E005), Phase 2 on left (E006). Phase 1 is in its final stages. Phase 2 is still in the design phase. Notice how each pond detains water from long channels before releasing it into Greens Bayou.

Phase II is immediately west of Phase I. It will be located on the property of the former Castlewood Subdivision, Sections 1 and 2. HCFCD completed preliminary engineering for Phase 2 in January 2021. The project is now in the design phase. It is budgeted for $20.5 million and scheduled to start construction in the summer of 2022.

Castlewood was built in the early 1960s in the Greens Bayou floodplain. It was also built in a former floodway of Greens Bayou before the bayou was rerouted and straightened circa the 1950s. Development occurred many years before the advent of Harris County’s first floodplain maps and associated development regulations in the 1980s. Since the late 1970s, there have been more than a dozen recorded flood events in the area.

Artist’s rendering of pond layouts from HCFCD community presentation. When complete, these basins will offer healthy recreational opportunities for area residents.

Together, Phases 1 & 2 comprise more than 200 acres – an area about 25% larger than Kingwood’s largest park – East End Park.

When complete, the ponds in both phases will have enough capacity to hold a foot of water falling across a two-square mile area. That’s water that won’t be going into Greens Bayou immediately during a big storm.

Posted by Bob Rehak on 10/14/2021

1507 Days since Hurricane Harvey