On Tuesday, Harris County Commissioners will vote on an asset-swap proposal that could improve drain and ditch maintenance county wide. It’s item 2A1 on the Commissioners Court Agenda. But it may take a while to implement. Here’s the background.
Untangling Overlapping Responsibilities
During recent storms, many blamed local flooding on lack of drain and ditch maintenance. The 80,000 cubic yards of silt clogging the lower portion of Ben’s Branch is just one example. Hundreds of others exist throughout the City of Houston and Harris County.
As the City and County Flood Control District tried to determine who was responsible for what, they became mired in legal tangles. Often, they discovered, both entities had responsibility for different portions of the same ditch.
But determining where one’s responsibilities stopped and the other’s started delayed mitigation and ran up legal fees. And even where responsibilities were clear cut, they wound up mobilizing two different crews, when one would have sufficed. This duplication of efforts ran up mitigation costs needlessly. It also often resulted in a patchwork quilt of repairs where one part of a ditch was maintained and another was not. And that reduced effectiveness.
Dividing Responsibilities by Core Competency
Luckily, common sense prevailed. The City and County reached an agreement in principle after Harvey to exchange responsibilities. Now each will focus on its core competency to maximize efficiency.
The goal: to get to a point where the City takes over responsibility for underground drainage and the County takes responsibility for above ground inside City limits.
One of the Flood Control District’s core competencies resides in ditch maintenance and improvements. Likewise, the City Public Works Department specializes in storm drains and sewers.
Any business school grad can tell you that companies maximize efficiency when focusing on their core competencies. The key: outsourcing parts of businesses where others offer greater efficiency.
Gradual Changeover In Series of Asset Swaps
However, the changeover won’t be like flipping a universal switch. It will happen gradually over several years with a series of asset swaps. Why? To ensure that neither side becomes saddled with deferred maintenance costs of the other.
Accordingly, each asset must be brought up to standards before swapping responsibilities.
Along with the agreement, the parties have identified the first batch of properties for exchange. However, they have not yet publicized those.
Only One Potential Problem
I only see one problem with this program. Some ditches that desperately need maintenance may not qualify for exchange before people flood.
Kings Forest, for example, has a ditch that parallels Valley Manor, west of Kingwood High School. Like Ben’s Branch, the City never maintained it. Now, water backs up dangerously close to homes on Kingsway Court and Twin Grove during heavy rains.
Rick Beaubien, a resident who lives near the ditch, took the pictures below.
Downed trees in ditch between Valley Manor and Twin Grove.
Clogged drain in same ditch.
North side of Kingwood Drive looking south. Trees and silt block channel and culverts.You can tell by the size of the trees that no one has maintained this ditch in a long time.Same culverts, but in center of Kingwood Drive.
Exit of same culvert south of Kingwood Drive
Dustin Hodges, District E North Sector Manager for Mayor Pro Tem Dave Martin indicates that Public Works is working on a plan to maintain this and other ditches. However, he also admits that “Currently, there are no available funds to address this ditch and there is no timeline on when any funds would be available for this ditch.”
Theory Good, Time Will Tell
I wholeheartedly support the asset-exchange program outlined in agenda item 2A1. Voting against it will not immediately accelerate the maintenance of ditches such as the one above. However, in principle and in the long run, it should help if the City and County treat neighborhoods equitably and partisan politics don’t intervene.
Posted by Bob Rehak on 4/26/2020with thanks to Rick Beaubien
971 Days since Hurricane Harvey
https://i0.wp.com/reduceflooding.com/wp-content/uploads/2020/04/image-3.png?fit=796%2C596&ssl=1596796adminadmin2020-04-26 15:40:362020-04-27 09:12:25Commissioners Will Vote Tuesday On Measure That Could Improve Drain/Ditch Maintenance
Construction activity Tuesday, April 21, 2020 at Perry Homes’ Woodridge Village north of Elm Grove Village.
At the last meeting, Commissioners deferred action while staff investigated: A) whether the City of Houston would donate land to the Harris County Flood Control District to help defray the cost of several flood mitigation projects, and B) whether Montgomery County would adopt Atlas-14 rainfall statistics and close a loophole in its drainage regulations that allowed developers to avoid building detention ponds. Commissioners also discussed harmonizing City of Houston and Harris County flood plain regulations.
Perry’s original deadline for a County purchase was April 1, 2020. The company subsequently extended the deadline to May 15 to give the County time to explore the requests. Meanwhile Perry resumed and accelerated construction activity on the site. I counted 32 pieces of earthmoving equipment on my April 21st flyover. Since then, spotters have reported the arrival of additional equipment.
The offer to sell while construction activity accelerates has many observers scratching their heads.
Precinct Four Commissioner Jack Cagle says he is “cautiously optimistic” that the sale will go through.
Romerica is Baaaa-aaaack
Last year, after the Army Corps withdrew Romerica’s application to develop 5,000 condos and 50-story high-rises in the floodplain of the San Jacinto, the company swore it would retool its application. Shortly after that, they fell off the radar. Romerica took down its many websites and its spokespeople did not return phone calls, but the company never sold the land.
Looking northwest across Romerica land. River Grove soccer fields are in upper left and Barrington is in upper right. San Jacinto West Fork in foreground. Harvey deposited the sand in the foreground which killed many trees.
Now, under the cover of Corona Virus, “they’re baaaa-aaaack.” But with a different name. Instead of The Heron’s Kingwood, they now call the development Orchard Seeded Ranches. I was reviewing the City of Houston’s PlatTracker website and noticed this item pop up on 4/20/2020.
The location, Council district, acreage, street intersections, and applicant name all fit the previous application. Instead of Gregory Haddad, however, this time, it’s Emil Haddad.
The development name is a bit odd. But then, development names rarely have anything to do with reality. Look at Houston’s Heights. And what, after all, did the Heron’s have to do with 50-story high rises?
“Orchard Seeded Ranches” is in the very preliminary phases. Until we see a plat and construction drawings, we can’t know exactly what they plan. It could be 1200-square-foot gerbil ranches. Or it could be Times Square in the Floodway again.
The company does not yet have a web site up. Nor has the Army Corps/Galveston issued a Public Notice associated with a permit application. Kingwood residents should follow this one closely.
Anyone civic-minded groups want to make them an offer on the land? It really should remain wetlands and be dedicated to park land or forest that protects Kingwood from future flooding.
Forest Cove Golf Course and Ron Holley
Earlier this month, Lake Houston Area developer Ron Holley appeared on KPRC to discuss the re-development of the Kingwood Cove Golf Course in Forest Cove. Holley was in the process of revising his engineering plans to address neighbors concerns about flooding when I interviewed him. A Freedom of Information Act request to the City of Houston revealed that he had not yet filed any plans for the subdivision. PlatTracker confirms that. Holley’s name does not appear anywhere in the current six pages of new developments at various stages.
Regardless, Holley has a formidable record as a developer. You may remember that he successfully challenged the City over building in the floodway of the West Fork, before he sold his land east of River Grove Park to Romerica.
Ryko Between Spring Creek and West Fork
One of the largest undeveloped tracts of land remaining in the Lake Houston area lies northwest of the confluence of Spring Creek and the West Fork near US59. Wetlands cover much of the area. But it’s in Montgomery County. And you know what that means. No detention ponds may be required.
Looking southeast across Ryko land toward the US59 Bridge in background (center).
Pacific Indio Properties, Inc., a sister company of Ryko Development, owns more than 7,400 acres in the triangle below. To put that in perspective, that’s exactly half the size of Kingwood.
National Wetlands Inventory shows the site to be pockmarked with wetlands.
A Community Impact article from 2016 (before Harvey) says Ryko planned to build 7,000 homes in this area. Community Impact said at the time that the project had no timeline. Things may have changed since then, especially after Hurricane Harvey inundated the area.
A drainage analysis, soil survey, and environmental study usually come before plan submittal. And the Montgomery County Engineers office says no plans, studies, or surveys have yet been submitted for the property, though one source in Montgomery County believes the developer has had preliminary discussions with the county.
Ryko property lies in the floodways of both the West Fork and Spring Creek. Cross-hatched equals floodway, Aqua = 100 year floodplain, and Brown = 500 year floodplain.
Note that the floodplain map above is pre-Harvey. New floodplain maps using Atlas-14 data are likely to show an even grimmer picture when they become available in a year or two.
If the developer puts high-density homes on this property with no detention, people downstream can break out their scuba gear. All the more reason for The City of Houston, Harris County and Montgomery County to synchronize their flood plain regs.
That’s the roundup for my first weekly watch list. I hope this becomes a regular weekly feature. More news to follow the commissioner’s court meeting on Tuesday.
Posted by Bob Rehak on 4/25/2020
970 Days since Hurricane Harvey
The thoughts expressed in this post represent opinions on matters of public concern and safety. They are protected by the First Amendment of the US Constitution and the Anti-SLAPP Statute of the Great State of Texas.
Harris County Flood Control District’s (HCFCD) work on Ben’s Branch has been one of the bright spots in flood mitigation since Hurricane Harvey. The channel is now wide open, bulldozers are neatening up the banks, and crews are hydromulching this morning.
What Is Hydromulch?
Hydromulch (or hydraulic mulch seeding, hydro-mulching, hydraseeding) is a planting process that uses a slurry of seed, mulch, and fertilizer. It is often used as an erosion control technique on construction sites, as an alternative to dry seed. The “gel” accelerates the growth of grass by providing enough moisture and nutrients for the seeds to germinate even in dry weather.
Progress Photos
Paul Campbell of Towncenter Apartments caught this shot outside his apartment this morning.
Hydromulching the banks of Ben’s Branch on 4/25/2020. Photo courtesy of Paul Campbell.Looking northwest over Ben’s Branch toward YMCA soccer fields (upper left). This and photos below taken 4/21/2020.Looking west up Ben’s Branch toward Kingwood Greens and Kingwood Country Club Forest Course across West Lake Houston Parkway.YMCA soccer fields in upper left.Reverse shot of the wide-open Ben’s Branch Channel looking east toward YMCA across West Lake Houston Parkway.
Hydromulching is usually the last step in channel repairs. Planting grass reduces erosion. Without it, rain would simply carry silt back into the channel.
Like New Again
Many thanks to the hard-working folks of the Harris County Flood Control district and their contractors.
In the last year, they have removed approximately 80,000 cubic yards of silt from the area between Kingwood Drive and the YMCA. Despite setbacks during Tropical Storm Imelda. Conveyance should now be restored to what it was in the mid-1990s.
Ben’s Branch hasn’t looked this good in decades. And residents will be much safer from flooding in future storms.
Posted by Bob Rehak on 4/25/2020 with thanks to Paul Campbelland HCFCD
Commissioners Will Vote Tuesday On Measure That Could Improve Drain/Ditch Maintenance
On Tuesday, Harris County Commissioners will vote on an asset-swap proposal that could improve drain and ditch maintenance county wide. It’s item 2A1 on the Commissioners Court Agenda. But it may take a while to implement. Here’s the background.
Untangling Overlapping Responsibilities
During recent storms, many blamed local flooding on lack of drain and ditch maintenance. The 80,000 cubic yards of silt clogging the lower portion of Ben’s Branch is just one example. Hundreds of others exist throughout the City of Houston and Harris County.
As the City and County Flood Control District tried to determine who was responsible for what, they became mired in legal tangles. Often, they discovered, both entities had responsibility for different portions of the same ditch.
But determining where one’s responsibilities stopped and the other’s started delayed mitigation and ran up legal fees. And even where responsibilities were clear cut, they wound up mobilizing two different crews, when one would have sufficed. This duplication of efforts ran up mitigation costs needlessly. It also often resulted in a patchwork quilt of repairs where one part of a ditch was maintained and another was not. And that reduced effectiveness.
Dividing Responsibilities by Core Competency
Luckily, common sense prevailed. The City and County reached an agreement in principle after Harvey to exchange responsibilities. Now each will focus on its core competency to maximize efficiency.
One of the Flood Control District’s core competencies resides in ditch maintenance and improvements. Likewise, the City Public Works Department specializes in storm drains and sewers.
Any business school grad can tell you that companies maximize efficiency when focusing on their core competencies. The key: outsourcing parts of businesses where others offer greater efficiency.
Gradual Changeover In Series of Asset Swaps
However, the changeover won’t be like flipping a universal switch. It will happen gradually over several years with a series of asset swaps. Why? To ensure that neither side becomes saddled with deferred maintenance costs of the other.
Accordingly, each asset must be brought up to standards before swapping responsibilities.
See the explanation for Agenda Item 2A1 – The Houston City Council approved the interlocal agreement on February 27, 2020. Harris County Commissioners will vote on it on Tuesday, 4/28/2020.
Along with the agreement, the parties have identified the first batch of properties for exchange. However, they have not yet publicized those.
Only One Potential Problem
I only see one problem with this program. Some ditches that desperately need maintenance may not qualify for exchange before people flood.
Kings Forest, for example, has a ditch that parallels Valley Manor, west of Kingwood High School. Like Ben’s Branch, the City never maintained it. Now, water backs up dangerously close to homes on Kingsway Court and Twin Grove during heavy rains.
Rick Beaubien, a resident who lives near the ditch, took the pictures below.
Dustin Hodges, District E North Sector Manager for Mayor Pro Tem Dave Martin indicates that Public Works is working on a plan to maintain this and other ditches. However, he also admits that “Currently, there are no available funds to address this ditch and there is no timeline on when any funds would be available for this ditch.”
Theory Good, Time Will Tell
I wholeheartedly support the asset-exchange program outlined in agenda item 2A1. Voting against it will not immediately accelerate the maintenance of ditches such as the one above. However, in principle and in the long run, it should help if the City and County treat neighborhoods equitably and partisan politics don’t intervene.
Posted by Bob Rehak on 4/26/2020 with thanks to Rick Beaubien
971 Days since Hurricane Harvey
Weekly Watch List: Perry, Romerica, Holley, Ryko
Those concerned about flooding in the Lake Houston Area should keep four potential developments on their watch lists. Here’s a brief update on each.
Perry Homes Woodridge Village
It’s back on the Harris County Commissioner’s Court Agenda again this week. Commissioners will discuss possible purchase of the 268 acres for a regional flood detention facility during an executive (closed) session on Tuesday.
At the last meeting, Commissioners deferred action while staff investigated: A) whether the City of Houston would donate land to the Harris County Flood Control District to help defray the cost of several flood mitigation projects, and B) whether Montgomery County would adopt Atlas-14 rainfall statistics and close a loophole in its drainage regulations that allowed developers to avoid building detention ponds. Commissioners also discussed harmonizing City of Houston and Harris County flood plain regulations.
Perry’s original deadline for a County purchase was April 1, 2020. The company subsequently extended the deadline to May 15 to give the County time to explore the requests. Meanwhile Perry resumed and accelerated construction activity on the site. I counted 32 pieces of earthmoving equipment on my April 21st flyover. Since then, spotters have reported the arrival of additional equipment.
Woodridge Village contributed to Elm Grove flooding twice last year. According to Perry, a regional flood detention facility would reduce flood risk for approximately 800 homes.
The offer to sell while construction activity accelerates has many observers scratching their heads.
Precinct Four Commissioner Jack Cagle says he is “cautiously optimistic” that the sale will go through.
Romerica is Baaaa-aaaack
Last year, after the Army Corps withdrew Romerica’s application to develop 5,000 condos and 50-story high-rises in the floodplain of the San Jacinto, the company swore it would retool its application. Shortly after that, they fell off the radar. Romerica took down its many websites and its spokespeople did not return phone calls, but the company never sold the land.
Now, under the cover of Corona Virus, “they’re baaaa-aaaack.” But with a different name. Instead of The Heron’s Kingwood, they now call the development Orchard Seeded Ranches. I was reviewing the City of Houston’s PlatTracker website and noticed this item pop up on 4/20/2020.
The location, Council district, acreage, street intersections, and applicant name all fit the previous application. Instead of Gregory Haddad, however, this time, it’s Emil Haddad.
The development name is a bit odd. But then, development names rarely have anything to do with reality. Look at Houston’s Heights. And what, after all, did the Heron’s have to do with 50-story high rises?
“Orchard Seeded Ranches” is in the very preliminary phases. Until we see a plat and construction drawings, we can’t know exactly what they plan. It could be 1200-square-foot gerbil ranches. Or it could be Times Square in the Floodway again.
The company does not yet have a web site up. Nor has the Army Corps/Galveston issued a Public Notice associated with a permit application. Kingwood residents should follow this one closely.
Anyone civic-minded groups want to make them an offer on the land? It really should remain wetlands and be dedicated to park land or forest that protects Kingwood from future flooding.
Forest Cove Golf Course and Ron Holley
Earlier this month, Lake Houston Area developer Ron Holley appeared on KPRC to discuss the re-development of the Kingwood Cove Golf Course in Forest Cove. Holley was in the process of revising his engineering plans to address neighbors concerns about flooding when I interviewed him. A Freedom of Information Act request to the City of Houston revealed that he had not yet filed any plans for the subdivision. PlatTracker confirms that. Holley’s name does not appear anywhere in the current six pages of new developments at various stages.
Regardless, Holley has a formidable record as a developer. You may remember that he successfully challenged the City over building in the floodway of the West Fork, before he sold his land east of River Grove Park to Romerica.
Ryko Between Spring Creek and West Fork
One of the largest undeveloped tracts of land remaining in the Lake Houston area lies northwest of the confluence of Spring Creek and the West Fork near US59. Wetlands cover much of the area. But it’s in Montgomery County. And you know what that means. No detention ponds may be required.
Pacific Indio Properties, Inc., a sister company of Ryko Development, owns more than 7,400 acres in the triangle below. To put that in perspective, that’s exactly half the size of Kingwood.
A Community Impact article from 2016 (before Harvey) says Ryko planned to build 7,000 homes in this area. Community Impact said at the time that the project had no timeline. Things may have changed since then, especially after Hurricane Harvey inundated the area.
A drainage analysis, soil survey, and environmental study usually come before plan submittal. And the Montgomery County Engineers office says no plans, studies, or surveys have yet been submitted for the property, though one source in Montgomery County believes the developer has had preliminary discussions with the county.
FEMA’s Flood Hazard Layer Viewer shows that virtually all of the land is in floodway or floodplain.
Note that the floodplain map above is pre-Harvey. New floodplain maps using Atlas-14 data are likely to show an even grimmer picture when they become available in a year or two.
If the developer puts high-density homes on this property with no detention, people downstream can break out their scuba gear. All the more reason for The City of Houston, Harris County and Montgomery County to synchronize their flood plain regs.
That’s the roundup for my first weekly watch list. I hope this becomes a regular weekly feature. More news to follow the commissioner’s court meeting on Tuesday.
Posted by Bob Rehak on 4/25/2020
970 Days since Hurricane Harvey
The thoughts expressed in this post represent opinions on matters of public concern and safety. They are protected by the First Amendment of the US Constitution and the Anti-SLAPP Statute of the Great State of Texas.
Ben’s Branch Update: Channel Wide Open, HCFCD Hydromulching Banks
Harris County Flood Control District’s (HCFCD) work on Ben’s Branch has been one of the bright spots in flood mitigation since Hurricane Harvey. The channel is now wide open, bulldozers are neatening up the banks, and crews are hydromulching this morning.
What Is Hydromulch?
Hydromulch (or hydraulic mulch seeding, hydro-mulching, hydraseeding) is a planting process that uses a slurry of seed, mulch, and fertilizer. It is often used as an erosion control technique on construction sites, as an alternative to dry seed. The “gel” accelerates the growth of grass by providing enough moisture and nutrients for the seeds to germinate even in dry weather.
Progress Photos
Paul Campbell of Towncenter Apartments caught this shot outside his apartment this morning.
Hydromulching is usually the last step in channel repairs. Planting grass reduces erosion. Without it, rain would simply carry silt back into the channel.
Like New Again
In the last year, they have removed approximately 80,000 cubic yards of silt from the area between Kingwood Drive and the YMCA. Despite setbacks during Tropical Storm Imelda. Conveyance should now be restored to what it was in the mid-1990s.
Ben’s Branch hasn’t looked this good in decades. And residents will be much safer from flooding in future storms.
Posted by Bob Rehak on 4/25/2020 with thanks to Paul Campbell and HCFCD
970 Days After Hurricane Harvey