Three areas in northwest Humble are in various stages of development. Parts or all of these areas flooded during Hurricane Harvey. The flooding was deep enough that reportedly one of the developers is not even going to try to raise the area. Instead, he said he will raise the homes 6-7 feet. Let’s hope that’s enough.
The numbers in the satellite image correspond to the groups of photos below. I took all shots on 1/3/23.
#1 will become light industrial. #2 will become single family residential. #3 will become single- and multi-family residential.
Area #1 – Light Industrial
According to a 2016 map by Skymark, the developer, the first area will become light industrial.
A four-lane divided road leads from the NW corner of Townsen Boulevard to Spring Creek on the north. By Skymark Development.The road abruptly stops before reaching Spring Creek and the Spring Creek Nature Trail.
The unpaved area between Spring Creek and where the road ends is owned by another developer (Pacific Indio) who also owns the land on the far side of the creek.
The Spring Creek Nature Trail cuts through the woods near the creek and follows it north toward I-45.Reverse angle shot looking SE toward Deerbook Mall shows large cleared area with stormwater detention basin.
Area #2 – Single Family Residential
Contractors are in the process of building roads into an area west of Target and Kohls. Saratoga Homes reportedly plans to build 357 homes and townhomes on this location.
Looking S from over Townsen Blvd. we can see two large stormwater detention basins (lower and upper left) Same area, but looking east toward Kohls and Target.
The closer shot below shows that not all the roads have been built yet.
Saratoga plans to build elevated homes here.
Area #3 – Single- and Multi-Family Residential
Looking south toward Sam’s with Townsen Blvd West on right, we can see a large stormwater detention pond that already has grass growing. This area will become single- and multi-family residential, some of which will be dedicated to seniors.
Note last of trees in center foreground being cleared and shredded for mulch. Spillway from detention basin seems to have a detour built into it. The purpose? Likely to slow the water and avoid erosion at the base of the utility poles.The long ditch on the left will drain Areas 2 and 3.
https://i0.wp.com/reduceflooding.com/wp-content/uploads/2023/01/20230103-DJI_0559.jpg?fit=1200%2C799&ssl=17991200adminadmin2023-01-09 13:31:172023-01-09 13:39:27Development Update on 3 Areas in NW Humble
Precinct 1 Commissioner Rodney Ellis has placed an item on the Commissioners Court agenda for 1/10/23 with far reaching ramifications for flood control in Harris County. It would change the way every future project is prioritized using a formula that gives almost half the weight to population and building density. Meanwhile, it ignores the amount of damage, severity of flooding, danger to infrastructure, historical underinvestment, and the difficulty of accurately estimating population in flood zones. Ellis’ recommendation could be used to permanently deny projects to heavily flood-damaged areas like Lake Houston.
Text of Motion
In Agenda Item #250, Ellis seeks: “Request for approval to direct the Harris County Flood Control District (“District”) to assign prioritization scores using the adopted 2022 Prioritization Framework for the Allocation of Funds from the Harris County Flood Resilience Trust to all new flood risk reduction projects funded by the District when requesting Commissioners Court approval to initiate the project, and to transmit those scores as quartiles to Commissioners Court.”
So what is that framework and why do we need it?
History of Recent Efforts to Prioritize Projects
Before the 2018 flood bond, Harris County flood control looked primarily at clusters of repeat damage to define and prioritize projects. That damage also formed the basis for obtaining partner funding in many cases.
However, when the perpetually underfunded Flood Control District received the huge infusion of cash from the 2018 flood bond, a problem arose. Which of the many worthy projects would be launched first? There simply weren’t enough qualified contractors to handle all needs simultaneously.
The text of the 2018 flood bond approved by voters contained a sentence that said, “…Commissioners Court shall provide a process for the equitable distribution of funds…” (See Paragraph 14-G). That became the key to the answer…with some verbal legerdemain by Ellis that turned “distribution” into “prioritization” and “equitable” into “equity.”
20% Existing Conditions (Drainage Level of Service)
20% Social Vulnerability
10% Project Efficiency
10% Partnership Funding
5% Long Term Maintenance Costs
5% Minimizes Environmental Impacts
5% Potential for Multiple Benefits
Total 100%
Commissioners, including Ellis, repeatedly affirmed their intent to complete all projects originally identified as part of the bond. The framework simply prioritized their start dates.
Commissioners also talked a lot about prioritizing “the worst first.” It was a nice sound bite, but never defined. Were the worst areas those with the most damage, deepest flooding, poorest residents, highest risk, or some combination of the above? Notice that the formula above omits flood damage, the traditional way of prioritizing funds and “ground-truthing” flood-risk estimates.
At this point, all of the projects in the bond have started. Their natural lifecycles and complexity will determine their order of completion. So, the debate has shifted from the flood bond to other sources of funding and future projects.
2021 Changes Applied to Flood Resilience Trust
In 2021, Commissioners created a Flood Resilience Trust using Toll-Road funds to backstop potential shortfalls in flood-bond partner contributions. The weighting used to allocate funds from the Trust changed significantly.
25% Structures Benefitted
20% Flooding Frequency
20% Social Vulnerability
10% Cost Per Structure
10% Partnership Funding
5% Maintenance Cost
5% Environmental Impact
5% Secondary Benefits
Total 100%
Flood Control used this formula only to prioritize the use of backstop funds in the Trust. Note this version of the formula eliminated both damage and risk reduction from consideration.
2022 Changes
In April, 2022, Commissioners modified the 2021 weights within the Prioritization Framework – still only for Flood Resilience Trust Funds – as follows:
45% Project Efficiency
15% Resident Benefits
30% Structure Benefits
20% Existing Conditions
20% Social Vulnerability Index
5% Long Term Maintenance Costs
5% Minimizes Environmental Impacts
5% Potential for Multiple Benefits
This 2022 formula omits consideration of damage, risk reduction and partnership funding. But it gives weight to population density (project cost divided by # residents benefitted). This 15-page PDF explains how projects are scored within each category above.
2023 Proposal
Commissioner Ellis now proposes applying the 2022 Resilience Trust formula to ALL FUTURE HCFCD PROJECTS.
Problems with Proposal
Flood Control would now use Ellis’ formula to decide which projects make the list, not just which go first.
Thus, the so-called “equity” formula once used to schedule projects could now be used to eliminate projects altogether.
Two thirds of the weight goes to density and social vulnerability. Only 20% relates to flooding.
The projects most likely to be eliminated would be outside the Beltway – in less dense areas that have traditionally received the least funding. In a post-bond, financially constrained environment, the weight given to density will put every project outside the Beltway at a disadvantage.
But the Ellis formula has many other problems, too. It:
Does not differentiate between types of structures while giving them almost a third of the weight. Thus, a mobile home counts for as much as a hospital or college.
Gives no weight to protecting critical infrastructure such as bridges, hospitals, grocery stores, wastewater treatment plants, etc.
Gives 20% weight to social vulnerability, but ignores the severity of flooding. Thus a low-income home with one inch of flooding counts as much as an entire condo complex swept away by 22-foot deep floodwaters.
Makes awards more subjective because HCFCD has no way of estimating how many people live in apartment buildings or homes. HCFCD can count buildings in satellite photos, but the number of residents benefitted will always be a guess. Census tracts do not follow floodplain boundaries.
Undermines efforts to prevent flooding, as opposed to correcting it after people are damaged. Prevention, such as HCFCD’s Frontier Program, is always more cost effective in the long run.
Forces Flood Control to judge projects before the District has engineering and cost data in hand that would help determine whether the projects are worth pursuing. That’s because “ALL FUTURE PROJECTS” include preliminary engineering projects.
Suggestions For Improvement
Below are several suggestions to improve the formula.
Define “worst first.” While the sentiment is noble, in practice, the term has no practical definition. (Ditto for equity.)
Incorporate measurements for severity of flooding and amount of damage. These really define worst.
Prioritize critical infrastructure such as bridges whose loss can jeopardize the economic vitality of the region.
Include partnership funds. They help stretch flood-mitigation tax dollars by almost a third. Even if people sometimes must wait longer to line up partner funding, partner funding helps more people in the long run.
Publish level-of-service data, used in the “existing conditions” calculation, for all streams in the county. It seems to be secret. I’ve been trying to get it for a year. Keeping it secret undermines trust in government. How do we know money is really going to the areas with the greatest risk?
Publish a 5-year Capital Improvement Plan similar to the City of Houston. Let people see what is coming, when, and for how much. That way we can hold HCFCD and Commissioners accountable. Plus, we can see their “formula” in action.
Be fair to all. The proposed formula is like playing cards with a stacked deck.
Posted by Bob Rehak on 1/7/23
1957 Days since Hurricane Harvey
The thoughts expressed in this post represent opinions on matters of public concern and safety. They are protected by the First Amendment of the US Constitution and the Anti-SLAPP Statute of the Great State of Texas.
https://i0.wp.com/reduceflooding.com/wp-content/uploads/2020/08/Ellis.jpg?fit=1200%2C809&ssl=18091200adminadmin2023-01-07 19:13:032023-01-08 10:27:15Ellis Trying to Change How All Flood-Control Projects Prioritized
The first leg of the three-mile route starts near the entrance to River Grove Park at the south end of Woodland Hills Drive in Kingwood. It used existing residential streets and new trails to snake its way to the Forest Cove Community Center. Then construction paused until demolition of the flooded townhomes on Aqua Vista, Timberline, and Marina Drives finished.
The second leg (dark purple below) follows existing streets through the old townhome site. However, contractors narrowed the streets to one lane. That accommodates bicycle and foot traffic, but limits most vehicle access.
Route of West Fork Greenway between River Grove Park and Edgewater Park.
The newest portion of the trail now extends from the Community Center to Hamblen Road via Timberline Pass, Timberline Drive, Aqua Vista and Burning Tree Court. The last street terminates at Hamblen, just west of the old Forest Cove Golf Course.
A final leg will extend west to Precinct 3’s Edgewater Park, paralleling Hamblen Road, but south of it (light purple).
Timing and Connections
Timing for the final leg has not yet been determined. Houston Parks Board eventually hopes to connect multiple waterways and adjacent hike and bike trail systems in the northern part of Harris County.
The pictures below, taken on 1/3/23, show the state of the most recent construction.
Landscaping along new trail (formerly part of Aqua Vista Drive. The trail is half the width of the old street. It should accommodate both hikers and bikers.Construction on Marina Drive and Timberline Pass. Forest Cove Community Center and Pool in upper left.Looking East.Reverse angle.Looking south from over Forest Cove Pool.Looking west from the former turnaround at the end of Aqua Vista.Facing west at trail connecting old Forest Cove townhome complex with Burning Tree Court. The latter turns north (right) and terminates at Hamblen Road.
More News to Follow When Plans Become Clear
The Parks Board plans to use some of the areas in the old townhome complex for parking. The fate of other streets remains unclear. Likewise, Harris County Precinct 3 has not yet announced plans for the long-awaited Edgewater Park. Harris County Flood Control District which bought out the townhome properties said it plans only to let the area return to green space.
Edgewater Park and this trail were one of the first good things to come out of Harvey. I just hope I live long enough to see them finished! Eventually, they will make a tremendous community asset.
Posted by Bob Rehak on 1/6/23
1956 days after Hurricane Harvey
https://i0.wp.com/reduceflooding.com/wp-content/uploads/2023/01/20230103-RJR_5433.jpg?fit=1200%2C800&ssl=18001200adminadmin2023-01-06 14:45:262023-01-06 14:45:29Next Leg of San Jacinto West Fork Greenway Now Hike- and Bikeable
Development Update on 3 Areas in NW Humble
Three areas in northwest Humble are in various stages of development. Parts or all of these areas flooded during Hurricane Harvey. The flooding was deep enough that reportedly one of the developers is not even going to try to raise the area. Instead, he said he will raise the homes 6-7 feet. Let’s hope that’s enough.
The numbers in the satellite image correspond to the groups of photos below. I took all shots on 1/3/23.
Area #1 – Light Industrial
According to a 2016 map by Skymark, the developer, the first area will become light industrial.
The unpaved area between Spring Creek and where the road ends is owned by another developer (Pacific Indio) who also owns the land on the far side of the creek.
Area #2 – Single Family Residential
Contractors are in the process of building roads into an area west of Target and Kohls. Saratoga Homes reportedly plans to build 357 homes and townhomes on this location.
The closer shot below shows that not all the roads have been built yet.
Area #3 – Single- and Multi-Family Residential
Looking south toward Sam’s with Townsen Blvd West on right, we can see a large stormwater detention pond that already has grass growing. This area will become single- and multi-family residential, some of which will be dedicated to seniors.
Together, all three areas comprise approximately 260 acres according to this map on the Skymark Development website.
To learn more about the history of these sites, see the posts below. They contain floodplain and wetland maps.
Onward. Into the danger zone!
Posted by Bob Rehak on 1/9/23
1959 Days since Hurricane Harvey
Ellis Trying to Change How All Flood-Control Projects Prioritized
Precinct 1 Commissioner Rodney Ellis has placed an item on the Commissioners Court agenda for 1/10/23 with far reaching ramifications for flood control in Harris County. It would change the way every future project is prioritized using a formula that gives almost half the weight to population and building density. Meanwhile, it ignores the amount of damage, severity of flooding, danger to infrastructure, historical underinvestment, and the difficulty of accurately estimating population in flood zones. Ellis’ recommendation could be used to permanently deny projects to heavily flood-damaged areas like Lake Houston.
Text of Motion
In Agenda Item #250, Ellis seeks: “Request for approval to direct the Harris County Flood Control District (“District”) to assign prioritization scores using the adopted 2022 Prioritization Framework for the Allocation of Funds from the Harris County Flood Resilience Trust to all new flood risk reduction projects funded by the District when requesting Commissioners Court approval to initiate the project, and to transmit those scores as quartiles to Commissioners Court.”
So what is that framework and why do we need it?
History of Recent Efforts to Prioritize Projects
Before the 2018 flood bond, Harris County flood control looked primarily at clusters of repeat damage to define and prioritize projects. That damage also formed the basis for obtaining partner funding in many cases.
However, when the perpetually underfunded Flood Control District received the huge infusion of cash from the 2018 flood bond, a problem arose. Which of the many worthy projects would be launched first? There simply weren’t enough qualified contractors to handle all needs simultaneously.
The text of the 2018 flood bond approved by voters contained a sentence that said, “…Commissioners Court shall provide a process for the equitable distribution of funds…” (See Paragraph 14-G). That became the key to the answer…with some verbal legerdemain by Ellis that turned “distribution” into “prioritization” and “equitable” into “equity.”
2019 Equity Prioritization Framework
In 2019, Ellis proposed (and the Court adopted) the “Prioritization Framework for the Implementation of the Harris County Flood Control District 2018 Bond Projects.” This framework ranked projects with a multi-factor index using the following weights:
Commissioners, including Ellis, repeatedly affirmed their intent to complete all projects originally identified as part of the bond. The framework simply prioritized their start dates.
Commissioners also talked a lot about prioritizing “the worst first.” It was a nice sound bite, but never defined. Were the worst areas those with the most damage, deepest flooding, poorest residents, highest risk, or some combination of the above? Notice that the formula above omits flood damage, the traditional way of prioritizing funds and “ground-truthing” flood-risk estimates.
At this point, all of the projects in the bond have started. Their natural lifecycles and complexity will determine their order of completion. So, the debate has shifted from the flood bond to other sources of funding and future projects.
2021 Changes Applied to Flood Resilience Trust
In 2021, Commissioners created a Flood Resilience Trust using Toll-Road funds to backstop potential shortfalls in flood-bond partner contributions. The weighting used to allocate funds from the Trust changed significantly.
Flood Control used this formula only to prioritize the use of backstop funds in the Trust. Note this version of the formula eliminated both damage and risk reduction from consideration.
2022 Changes
In April, 2022, Commissioners modified the 2021 weights within the Prioritization Framework – still only for Flood Resilience Trust Funds – as follows:
This 2022 formula omits consideration of damage, risk reduction and partnership funding. But it gives weight to population density (project cost divided by # residents benefitted). This 15-page PDF explains how projects are scored within each category above.
2023 Proposal
Commissioner Ellis now proposes applying the 2022 Resilience Trust formula to ALL FUTURE HCFCD PROJECTS.
Problems with Proposal
Flood Control would now use Ellis’ formula to decide which projects make the list, not just which go first.
Two thirds of the weight goes to density and social vulnerability. Only 20% relates to flooding.
The projects most likely to be eliminated would be outside the Beltway – in less dense areas that have traditionally received the least funding. In a post-bond, financially constrained environment, the weight given to density will put every project outside the Beltway at a disadvantage.
But the Ellis formula has many other problems, too. It:
Suggestions For Improvement
Below are several suggestions to improve the formula.
Posted by Bob Rehak on 1/7/23
1957 Days since Hurricane Harvey
The thoughts expressed in this post represent opinions on matters of public concern and safety. They are protected by the First Amendment of the US Constitution and the Anti-SLAPP Statute of the Great State of Texas.
Next Leg of San Jacinto West Fork Greenway Now Hike- and Bikeable
The second leg of the Houston Parks Board’s San Jacinto River West Fork Greenway is taking shape nicely. Contractors have apparently finished concrete work and landscaping. It can now be hiked and biked.
Route of San Jacinto West Fork Greenway
The first leg of the three-mile route starts near the entrance to River Grove Park at the south end of Woodland Hills Drive in Kingwood. It used existing residential streets and new trails to snake its way to the Forest Cove Community Center. Then construction paused until demolition of the flooded townhomes on Aqua Vista, Timberline, and Marina Drives finished.
The second leg (dark purple below) follows existing streets through the old townhome site. However, contractors narrowed the streets to one lane. That accommodates bicycle and foot traffic, but limits most vehicle access.
The newest portion of the trail now extends from the Community Center to Hamblen Road via Timberline Pass, Timberline Drive, Aqua Vista and Burning Tree Court. The last street terminates at Hamblen, just west of the old Forest Cove Golf Course.
A final leg will extend west to Precinct 3’s Edgewater Park, paralleling Hamblen Road, but south of it (light purple).
Timing and Connections
Timing for the final leg has not yet been determined. Houston Parks Board eventually hopes to connect multiple waterways and adjacent hike and bike trail systems in the northern part of Harris County.
For instance, this project will connect to the Spring Creek Greenway across the old US 59 pedestrian bridge. When complete, it will create one of the longest urban hike-and-bike trail networks in the United States.
Photos of Newest Leg of West Fork Greenway
The pictures below, taken on 1/3/23, show the state of the most recent construction.
More News to Follow When Plans Become Clear
The Parks Board plans to use some of the areas in the old townhome complex for parking. The fate of other streets remains unclear. Likewise, Harris County Precinct 3 has not yet announced plans for the long-awaited Edgewater Park. Harris County Flood Control District which bought out the townhome properties said it plans only to let the area return to green space.
Edgewater Park and this trail were one of the first good things to come out of Harvey. I just hope I live long enough to see them finished! Eventually, they will make a tremendous community asset.
Posted by Bob Rehak on 1/6/23
1956 days after Hurricane Harvey