HCFCD Starts More Repairs on Taylor Gully
Harris County Flood Control District (HCFCD) has begun a three-month repair project on Taylor Gully near Maple Bend Drive in Kingwood’s Woodstream Forest. The repairs will extend 750 feet upstream and 1500 feet downstream of Maple Bend. The entire length of the project lies within a man-made channel and does NOT extend into the natural area on the northeast. See below.
This work activity will have no effect on wetlands; threatened or endangered species or their habitats; cultural or historic resources; or rookeries.
Purpose of Project
The purpose: to repair erosion and side-slope failures; repair or replace outfalls; rectify flowlines; and rehabilitate existing backslope swale systems.
- Erosion repairs include the placement of fill material, placement of 3″x5″ granular fill and the placement of grade #1 riprap.
- Channel cross sections will be restored to the original design where feasible.
- The oldest recorded drawing on file is for the proposed channels from Elm Grove Village to White Oak Creek completed in March 1982. Record drawings typically show a 6-foot wide channel bottom with 3:1 side slopes.
Several homes in this neighborhood flooded during Imelda when water backed up into streets. While the rainfall amounts exceeded the capacity of storm drains, damaged outfalls could also have contributed to such backups. So restoring damaged outfalls will help reduce flood risk.
The earthwork will consist of installation of granular fill and Grade 1 riprap below the ordinary high-water mark. Sediment will be excavated to contour channel side slopes and bottom dimensions to match previously rectified conditions.
Previous Repair History
HCFCD record drawings show a general repair project on G103-80-03.1 in July 2012. According to HCFCD records, an emergency repair on the baffle structure on G103-80-03.1 was completed in October of 2019.
Such baffles slow the flow of stormwater to enable the channel downstream of the structure to drain efficiently, according to Beth Walters, a spokesperson for HCFCD.
Taylor Gully was twice severely damaged by excessive flow from Woodridge Village upstream at the Montgomery County Line in 2019. The new development flooded severely on May 7 and September 19 when sheet flow from heavy rains poured into the gully before Woodridge Village’s detention ponds were completed. This is the second major repair project since then. The first extended from the county line to near West Lake Houston Parkway.
Utility Crossings
Utilities along this reach of Taylor Gully (G103-80-03.1) include natural gas, telecommunication, electric, sanitary sewer and water. The CenterPoint gas line, telephone line, and water line all cross the channel at Maple Bend Drive. A 10” sanitary sewer line crosses the channel at the downstream end of the project.
Posted by Bob Rehak on 1/19/2021 with thanks to Beth Walters, Harris County Flood Control District
1239 Days since Hurricane Harvey and 488 since Imelda