The detention basin at the Laurel Springs RV Resort was supposed to have been a dry-bottom pond. Despite one of the driest springs on record, it’s still holding water. And it’s still leaking into Harris County Precinct 3’s Edgewater Park. Despite:
The leak in question is in the exact place where contractors dug a trench through the south wall of the detention pond. They discharged silt that spread out for hundreds of feet into the wetlands of the park. Then they laid pipes in the trench and covered them up.
But somehow silty, oily stormwater still seems to be escaping into the wetlands from where the pipes were.
5/15/22
5/22/22
One wonders why the pumps in the approved drains are still not working. See bottom center in photo below.
Obviously, from all the standing water, they still have a little work left to do on drainage.
Still No Replacement Trees Planted
The developer also has a lot of work to do replanting trees. Note the wide swath outside the fence in the photo above that stretches for approximately 750 feet. That’s where the contractor destroyed trees in the county park.
Posted by Bob Rehak on 5/22/2022
1727 Days since Hurricane Harvey
The thoughts expressed in this post represent opinions on matters of public concern and safety. They are protected by the First Amendment of the US Constitution and the Anti-SLAPP Statute of the Great State of Texas.
https://i0.wp.com/reduceflooding.com/wp-content/uploads/2022/05/20220522-DJI_0526-2.jpg?fit=1200%2C799&ssl=17991200adminadmin2022-05-22 17:43:332022-05-22 20:13:03RV Resort Still Leaking Stormwater into County Park
After an unannounced investigation of the Laurel Springs RV Resort construction site on February 2, 2022, the Texas Commission on Environmental Quality (TCEQ) issued a Notice of Enforcement (NOE) Letter to the contractor, Higbie Ventures of Texas, Inc. The TCEQ investigation found Higbie:
Failed to maintain Best Management Practices in effective operation condition
Had not maintained the construction site entrance
Did not protect stormwater inlets
Damaged erosion controls
Improperly installed erosion controls
Did not install erosion controls as prescribed in the Stormwater Pollution Prevention Plan along the southern and western perimeters
Let sediment accumulations travel offsite unimpeded onto neighboring property for approximately 158 yards
Trenched the southern berm of its detention pond, letting stormwater escape onto neighboring property, a non-compliant discharge
Violated requirements of their Construction General Permit
Failed to remove sediment accumulations often enough to minimize further negative effect
The investigator felt the non-compliant discharge in late January warranted enforcement action. The TCEQ then issued a Notice of Enforcement Letter (NOE) to “facilitate” compliance.
64-Page Report Brims With Photos Showing Violations
The TCEQ investigator, Kyle Linville, required documentation showing the contractor had remedied all violations by February 7. But on February 14, Linville noted that several violations remained outstanding, including failure to:
Maintain Best Management Practices in effective operating condition
Install sediment controls on the southern boundary of the site
Remove sediment accumulations often enough to minimize further negative effects.
Linville’s observations largely match mine and those of nearby residents who have communicated with me re: issues at the controversial construction site. Strangely, a City of Houston investigation found no problem, triggering two more investigations, but the City has not yet released the results of those.
Contractor Apparently Still Not Fully in Compliance
Since the TCEQ issued its notice of enforcement letter, most but not all of the violations have been corrected. However, Higbie still has not installed silt fencing along the western perimeter. And when I went by there today, trucks had once again turned Laurel Springs Lane into a muddy mess.
Contractor Claims Re: Unauthorized Discharge
The contractor admitted that he discharged stormwater into Edgewater Park without authorization. However, he claimed that it was necessary to begin installing pumps that would discharge stormwater into the Lakewood Cove Storm Sewer System. The contractor claimed that standing water in the detention pond had infiltrated the soil in the pond wall. That made the pond wall so unstable that heavy equipment could not operate safely on the wall, said the contractor, in his response to the TCEQ.
However, photos taken on the day of the trenching, 1/29/22, show heavy equipment already operating on the wall and the pump housing already partially installed.
On page 54 of the report, the contractor claims he dug the trench on 1/30/22, not 1/29.
He also admits that he placed 8″ pipe in the wall, but claims he removed it “the next day” on “1/31/21.” That would have been 10 months before the site was even cleared. But assuming he meant 1/31/22, the claim doesn’t match what I photographed that day. I photographed the contractor covering up pipe, not removing it. See below.
Is he claiming that he filled in the whole trench only to redig it on the same day and remove the pipe? That would have been amazingly inefficient. However, it would help explain some of the contractor’s failures. In the last 20 years, eight of Higbie’s 13 entities in Texas have gone out of business. He lost six of the eight to tax forfeitures.
Trust But Verify
Mr. Linville produced an excellent and thorough report of his investigation. But I hope he explores some of Higbie’s claims further without just taking Higbie’s word that he complied. As auditors say, “Trust but verify.” Did the contractor really remove the pipe? Did he install invisible silt fence on the western perimeter? Why is Higbie still pumping water out of the pond with portable pumps almost two months after installing the housing for permanent pumps.
We should never forget how excess sedimentation contributed to the flooding of thousands of homes along the West Fork during Harvey.
Posted by Bob Rehak on 3/26/22
1670 Days since Hurricane Harvey
The thoughts expressed in this post represent opinions on matters of public concern and safety. They are protected by the First Amendment of the US Constitution and the Anti-SLAPP Statute of the Great State of Texas.
00adminadmin2022-03-26 17:52:282022-03-26 18:02:05TCEQ Issues Notice of Enforcement to Laurel Springs RV Resort
TCEQ observed process water outside Triple PG’s property boundary and concluded, “The allegation of a discharge of process water was confirmed. As a result of the investigation conducted on March 11, 2020, one alleged violation was noted for failure to prevent the discharge of process water.” That was the fourth such finding in five years for the mine.
TCEQ says in part, “Because process water was located outside of the facility’s property boundary with a high likelihood to enter waters of the state, an unauthorized discharge had occurred.”
676% Higher Levels of Suspended Sediment than Creek Water
Wastewater was overflowing from Ponds Five and Six. Analysis of water samples showed that the overflow had levels of suspended solids in it that were 137% to 676% higher than the background level found upstream in White Oak Creek. That’s more than 2X to almost 8X above the creek water.
Discharge Not Authorized
Both TCEQ rules and the terms of the injunction prohibit any discharges of process water not authorized by the TCEQ.
The Notice of Enforcement issued by the TCEQ on 4/3/2020 cites, “Unauthorized discharge of process water: Specifically, during the investigation conducted on March 11, 2020, process water was noted outside the property boundary of Triple PG Sand Development Facility with the likelihood to enter waters of the state.”
Recommended corrective action? TCEQ simply says, “There shall be NO unauthorized discharge of pollutants.”
Additional Fines Possible
The Texas Water Code Section 7.102 allows fines up to $25,000 per day for each day of a continuing violation. See flooded neighboring properties above in January, February and March flyover photos.
That water was building up and flooding adjoining properties for at least three months. This could get expensive for Triple PG!
The Attorney General’s office did not respond yet to a request for comment about the type of penalties that it would seek, if any.
Fourth Unauthorized Discharge in Last Year
TCEQ has conducted eight other investigations at Triple PG in the previous 5 years. They included investigations into:
Failure to renew their registration
Alleged failure to maintain pollution prevention measures and controls
Failure to maintain a Stormwater Pollution Prevention Plan (SWP3)
Unauthorized discharge of process water (three times since May 2019)
This makes the fourth citation for unauthorized discharges in a year.
Editorial Comment: This mine just doesn’t seem to take the TCEQ, Attorney General, State of Texas or the health of their neighbors seriously. I hope the Attorney General shuts them down.
Posted by Bob Rehak on 4/6/2020
951 Days after Hurricane Harvey and 200 after Imelda
The thoughts expressed in this post represent opinions on matters of public concern and safety. They are protected by the First Amendment of the US Constitution and the Anti-SLAPP Statute of the Great State of Texas.
https://i0.wp.com/reduceflooding.com/wp-content/uploads/2020/03/20200306-RJR_0052.jpg?fit=1200%2C800&ssl=18001200adminadmin2020-04-06 18:39:052020-04-06 20:36:51TCEQ Alleges Fourth Unauthorized Discharge in 10 Months at Triple PG Mine
On May 18, Josh Alberson and I gave Tony Buzbee a tour of sediment and sand mining issues on the San Jacinto River. Buzbee is a candidate for Mayor of Houston and got to witness first hand some of the problems I have been talking about for almost two years now. On Caney Creek, we stumbled across a giant breach in the dike of the Triple-PG mine in Porter. We reported it immediately to the TCEQ.
Two-Week Discharge
Investigators actually observed the unauthorized discharge of process water from the mine into the City’s drinking water supply. It continued for approximately two weeks.
Not One, But Two Massive Breaches
The TCEQ found not one, but two breaches. The first was on the southwest side of the mine. Water entered the mine from a breach of the dike near White Oak Creek. The water then swept through the mine and exited through a second breach on Caney Creek. That meant the two creeks were actually flushing process water out of the mine into the drinking water supply for two million people.
The TCEQ finished its investigation in July and cited the operation for failing to prevent the unauthorized discharge of process water. The TCEQ told them to repair and widen their dikes. They did. Case closed.
This same mine has been investigated five times in five years by the TCEQ for various problems detailed in this report. The mine is owned by a cardiologist from Nacogdoches named Guniganti. His family operates it.
The basic problem with this mine is its location. It sits at the confluence of two floodways. That’s why the dikes were blown out. That’s why Harvey’s floodwaters swept through it. Continuing to operate this mine is like flying a plane into conditions that you know are unsafe.
No Disincentive for Dangerous Business Practices
Yet there’s no disincentive for dangerous business practices. Investigators told the operators to fix the breaches. They did. Business will go on as usual. Until the next disaster.
As a society, why do we tolerate this?
We even seem to venerate it. How strange that one family’s profit outweighs the health and safety of millions! The legislature had an opportunity to fix this problem this year. However, one bill that would have established best practices for sand mining and another that would have established minimum setbacks from rivers for sand mines never made it out of committee. Likewise HB-908 proposed by State Representative Dan Huberty that would have provided meaningful financial penalties for such bad practices never made it out of committee.
The thoughts expressed in this post represent my opinions on matters of public interest and safety. They are protected by the First Amendment of the US Constitution and the Anti-SLAPP statute of the great State of Texas.
https://i0.wp.com/reduceflooding.com/wp-content/uploads/2019/05/Mine-Breech.jpg?fit=1500%2C1000&ssl=110001500adminadmin2019-08-23 00:01:462019-08-23 00:19:45TCEQ Observes Triple-PG Sand Mine Discharging Wastewater Directly into Tributary of Lake Houston