Those who have fond memories of boot camp in the military may appreciate the buzz-cut look of Meritage Homes’ new development in Kings River. These photographs, taken on Sunday 3/10/24, speak for themselves.
Industrial-Scale Terraforming
Contractors have shorn vegetation from the area, except for a thin strip of trees around part of the perimeter. The next step will be to start digging a detention basin and redistributing the dirt across the site. They will use the dirt to fill in wetlands and elevate home pads.
Twenty acres gone! In about a month!
The result will be rank-and-file tract homes on parade, most likely with some kind of landscaping allowance.
Enjoy the Trees While You Can
It’s not clear yet when Meritage plans to begin Phase II of its Kings River development. The company owns another 20-acre tract on the east side of Pinehurst Trail Drive.
In another 20 to 30 years, the new development should blend in somewhat with the surrounding area.
In the meantime, assuming the engineering company properly configured drainage requirements and we don’t get any monster storms, Meritage may avoid adversely impacting surrounding homes with runoff.
Such developments underscore the need for community associations to purchase forested areas they want to preserve for recreation, beauty, flood-risk reduction, and protection of home values. Ironically Harris County Appraisal District valued this land at less than $400,000.
Posted by Bob Rehak on 3/11/24
2386 Days since Hurricane Harvey
https://i0.wp.com/reduceflooding.com/wp-content/uploads/2024/03/20240310-DJI_0233.jpg?fit=1100%2C733&ssl=17331100adminadmin2024-03-11 14:21:152024-03-11 14:21:17New Kings River Development Gets a Buzz Cut
Meritage Homes of Texas LLC, a company based in Scottsdale, Arizona, has begun clearing 40.2 acres between Kings River and Pinehurst of Atascocita. The company will reportedly build 210 homes there – 5.2 per acre. Although the new development is far above floodplains, wetlands cover a large part of the first phase.
Two Phases of Development
Meritage told homeowners in the area that it plans to develop the land in two phases, with the second still several years away.
The two parcels bracket Pinehurst Trail Drive. The first stretches along Kings Park Way almost to West Lake Houston Parkway (WLHP) on the west. The second stretches to the Atascocita Golf Club on the east. (See satellite image below.)
The presence of wetlands (and a gas pipeline) may indicate why this property was not developed until now.
The definition of “jurisdictional wetlands” has flip-flopped in recent years as one administration after another has tweaked the definition of “waters of the U.S.” (WOTUS). Currently, we’re dealing with Biden’s changes to Trump’s changes to Obama’s changes. It’s not simple.
The definition stretches more than 100 pages and determines what the Army Corps protects.
It’s not clear at this time whether the Army Corps has ruled whether these particular wetlands fall under their jurisdiction.
Western Parcel Being Cleared First
Photographs taken on Feb. 13, 2024, show that contractors have already cleared a significant portion of the first phase, which is on the west. See images below.
Note the small channel that appears to be draining the wetland area. According to the schematic diagram below, homes, driveways and roads will eventually cover this channel and the area it drains.
Layout of Homes and Detention Basins
Plans indicate the area will have 124 30×80 foot lots and 86 40×80 lots. That’s fairly high density. And it will have a high percentage of impervious cover that generates a lot of runoff quickly. Luckily, the development will have four stormwater detention basins, according to the diagram below posted on Facebook.
A resident indicated that a deed to the property requires Meritage to maintain a buffer of at least 25-30 feet of wooded land along the property boundary. That should help retain/restrain runoff, too. See photo below.
Construction Plans and Drainage Analysis to Follow
According to residents, Meritage just closed on the property in January. Given the recent sale, I do not yet have full construction plans or a drainage impact analysis. However, I have submitted a FOIA Request to Harris County Engineering and will provide them when I get them.
When I photographed the clearing activity this morning, it had silt fence around most of the perimeter (an improvement from last Sunday).
The silt fence is also an improvement over a neighboring development on WLHP by Trammell Crow.
Neighboring Development Still in Quagmire.
Harris County Engineering and Constables shut down construction at the Trammell Crow site after it flooded Kings Park Way, WLHP, and neighboring properties during heavy rains in late January.
This morning, I noticed that contractors are back at work behind tall privacy fences. However, they still lack silt fences along large parts of their property. Moreover, trenches that they dug to drain the property to a sediment pond had been blocked off to accommodate construction equipment. See below.
Stormwater is the enemy of construction. That’s why most contractors implement measures to control it upfront in a project, not after the fact. Let’s pray that Meritage’s contractors protect their neighbors better.
Posted by Bob Rehak on 2/13/24
2359 Days since Hurricane Harvey
The thoughts expressed in this post represent opinions on matters of public concern and safety. They are protected by the First Amendment of the US Constitution and the Anti-SLAPP Statute of the Great State of Texas.
https://i0.wp.com/reduceflooding.com/wp-content/uploads/2024/02/20240213-Screenshot-2024-02-13-at-11.31.53 AM-3.jpg?fit=1100%2C496&ssl=14961100adminadmin2024-02-13 14:56:192024-02-13 15:24:14Meritage Begins Clearing 40 Acres for 210 Homes, Many Over Wetlands