HCFCD Finishes Repair of Kingwood Diversion Ditch At Walnut Lane
Harris County Flood Control District (HCFCD) has finished construction work on the repair of erosion in the the Kingwood Diversion Ditch near Walnut Lane between Forest Cove and Trailwood. HCFCD still has to plant grass, but the heavy lifting is done.
Before, During and After Photos
The pictures below show the way the ditch near Walnut Lane was and how it looks today.
Posted by Bob Rehak on 6/29/2020
1035 Days since Hurricane Harvey