Engineering Plans for Figure Four Development Near Elm Grove

Below are several links that allow you to download the engineering plans for Woodridge Village, sections one and two. I haven’t had time to read them yet. Frankly they make my eyeballs bleed. But maybe some younger eyes can help.

I’m posting these because Kingwood is full of engineers who are more qualified to evaluate them than I. All of us are smarter than one of us.

Cover page of first doc showing detention plans.

Woodridge Village, Sections One and Two, comprise those huge clearcut areas north of Elm Grove. During heavy rains last week, video shows water pouring out of the newly clearcut section into Elm Grove. Something appears to have gone wrong. Texas law prohibits flooding your neighbors.

Please Help Review Engineering Plans

The first talks about their constructions plans for Waterline Relocation and Detention Ponds.

The second talks about their Water, Sanitary Sewer and Drainage Facilities & Paving and Appurtenances for Section 1 of the development.

The third talks about their Water, Sanitary Sewer and Drainage Facilities & Paving and Appurtenances for Section 2 of the development.

I would love to hear from civil engineers who know about these things. Reply in confidence through the contact form on this web site.

A shout-out to Houston City Council Member Dave Martin and his staff for supplying these documents. And another to Montgomery County for supplying them to him.

Posted by Bob Rehak on 5/15/2019

624 Days since Hurricane Harvey